2 Sudan Logistics Infrastructure
National logistics infrastructure is under the responsibility of the Sudan Ministry of Transport, Roads and Bridges.
Traditionally Sudan has operated through one entry point, the Port of Sudan. However, corridors are also potentially possible through Ethiopia for both regional procurements and/or consignments coming through Djibouti port.
Common constraints are security concerns and the impassability of roads during the rainy season (from May to October). In most deep field locations, no commercial transporters are available and therefore WFP operates its own fleet of trucks, which is strategically placed in the 3 Darfur areas, El Obeid and Khartoum to ensure a quicker mobilisation of resources and adjustments to operational needs. The fleet can support other organisations on a case by case basis and depending on availability.
2.1 Sudan Port of Port Sudan
Port Overview
(Source: General Admin for Planning & Research / Statistics and Information centre)
Port Sudan is the capital of the Red Sea State and the Republic of Sudan’s main sea port. It is situated on latitude (19 ` 39) north and longitude (73 ` 13) east on the middle of the Red Sea coast and was established in 1910. It occupies a strategic location in the centre of the west coast of the Red Sea about 1200 km northeast Khartoum and about 260 km southwest Jeddah (in Saudi Arabia Kingdom). Port Sudan is mainly handling general cargo, livestock, cement, containers, oil products, grains, pesticides and cars.
The Sea Ports Corporation (SPC) is an independent state corporation of Sudan that governs, constructs, and maintains the ports, harbours and lighthouses of Sudan. The company was founded in 1974 by the government of Sudan to be the national port operator and port authority. The Ports of Sudan fall under the Ministry of Transport, Roads and Bridges.
Website: www.mot.gov.sd
Port website: www.sudanports.gov.sd
Key port information may also be found at http://www.maritime-database.com
PORT LOCATION & CONTACT |
|
Country: |
Sudan |
Province or District: |
Red Sea State |
Nearest Town or City: |
Port Sudan - 2 km |
Port's Complete Name: |
Port Sudan Port |
Latitude: |
19 º 36’ 57” N |
Longitude: |
27 º 13’ 28” E |
Managing Company or Port Authority: |
Sea Ports Corporation, PO Box 531, Port Sudan Quays, Port Sudan, Republic of Sudan |
Management Contact Person: |
Mr. Jalal Eldin. M.A. Shelia (General Manager) Tel: +249912308514 Email: spcp@sudanmail.net |
Nearest Airport and Airlines: |
Port Sudan International Airport: Badr Airlines, Flydubai, Nile Air Cairo, Tarco Airlines, Sudan Airways, SAUDIA |
Port Picture
Port Sudan is divided into four components. The North Port B quays include 12 berths of a total 1866 meters long with alongside depths from 8.5 to 10.7 meters, handling primarily general cargo, edible oils, and molasses. The five berths that handle general cargo and molasses are a total of 822 meters long with alongside depths from 8.5 to 10.7 meters. Four berths of 365.7 meters with alongside depth of 10.7 meters handle general cargo and edible oils.
Port Sudan Harbor consists of:
- The North Port, which is the oldest Port, consisting of 12 berths with depths between 8.5 meters and 10.7 meters allocated for general cargo, bulk cement, edible oils, and molasses.
- The South Port consists of 6 berths, berth #15 for the handling of grains and general cargo, berths 13 through to 18 for containerised traffic.
- The Green Port consists of 4 berths with a total lengths of 1226 meters and a depth of 14.7 meters. It is equipped with services for dry bulk cargo and it is able to accommodate vessels up to 50,000 DWT
- The Alkhair (Dama Dama) oil terminal can receive tankers up to 50,000 DWT with a draft of 14.6 meters
Berth Number |
Length / meter |
Draft / meter |
Purpose |
1-2-3-4-5 |
597 |
8.5 |
General cargo, molasses, bulk cement |
5 A |
229.8 |
9.5 |
Molasses, cement, general cargo |
6 – 7 |
365.7 |
10.7 |
Bulk cement, general cargo |
8 – 9 |
365.7 |
10.7 |
Edible oils, general cargo |
11 |
106.7 |
8.5 |
General cargo, bulk cement |
12 |
201.8 |
8.5 |
General cargo, bulk cement |
Description and Contacts of Key Companies
The main company at the port is the Sea Port Corporation, which is the national port operator and authority.
Port Performance
The Port is designed and has the capacity to handle Panamax size bulk carriers.
Performance: Year 2017 |
|
Vessels Calls |
638 |
Container traffic (TEU’s) |
487,336 |
Total Cargo Handling (mt) |
11,877,745 |
Total Annual Capacity of the Port |
Port capacity (containers): 1,200,000 Metric Tons Port capacity (break bulk): 5,000,000 Metric Tons Port capacity (dry bulk): 4,000,000 Metric Tons Port capacity (liquid bulk): 3,000,000 Metric Tons |
Vessels calls have decreased by only 15.5% from 755 calls in 2014 to 638 calls in 2017.
Import traffic has increased by 60% from 6 Million tons in 2014 to 9.6 Million tons in 2017.
Exports have increased by 532% from 350,409 tons in 2014 to 2,215,005 tons in 2017.
Capacity: Year 2017 |
Bulk (Incl Petroleum) |
Container |
Conventional |
MT |
TEU’s |
MT |
|
Export activity of the Port |
zero |
234,953 |
433,781 |
Import activity of the port |
5,200,851 |
252,383 |
1,563,479 |
SEASONAL CONSTRAINTS |
||
|
Yes / No |
From <month> to <month> |
Rainy Season |
YES |
October - December |
Major Import Campaigns |
NO |
|
Other |
NO |
|
Discharge Rates and Terminal Handling Charges
Link to relevant tariff/rates webpage: www.sudanports.gov.sd
The cargo handling and discharge rates at the Port of Sudan are:
Bagged cargo |
2500 MT/wwd |
Bulk cargo, grain bulk via Hoppers then bagged on the quayside |
2500 MT/wwd |
Bulk discharge via Hooper, Hal to Sayga Silo in bulk trucks (4 gangs) |
9600 MT/wwd |
Silo – Discharge direct to Silo (berth 15) |
4800 MT/wwd |
Vehicles per hour, provided units are mobile |
150-200 unit/hour |
Containers |
20 lifts per gantry per hour |
General cargo |
based on type of the cargo / position of stowage / vessel crane capacity |
The discharge rates are based on the working norms of the Port and are not those negotiated by World Food Programme.
Shifts per day 7 hours per shift normal working 6 hours
(1hrs break each shift) Working hours Saturday/Thursday
1st shift 0730 – 1430
2nd shift 1530 - 2230
3rd shift 2330 - 0530 (Overtime)
Friday and gazette official holiday port operates on an overtime basis
1st shift 0730 - 1200
2nd shift 1530 - 2230
3rd shift 2330 – 0530
Berthing Specifications
Berthing Specifications |
|||
Total Berths |
Quantity |
Length (m) |
Draft (m) |
Conventional Berths |
9 |
1556 meters |
Berth 1-5 = 8.5 meters draft, Berth 5A 9.5 meters, Berths 6-9 =10.7 meters. |
Container Berths |
5 |
933 meters |
Berths 13-14 = 16 meters , Berth 17-18 12.6 meters draft |
Bulk Oil Jetties |
1 |
310 meters |
14.6 meters |
Cased Oil Jetties |
2 |
|
|
Bulk Cement Berths |
2 |
208 meters |
Berth 11= 8.7 meters draft, Berth 12 = 10 meters draft |
Lighter age and Dhow (other) Wharves |
Nil |
n/a |
n/a |
Explosives Jetty |
Nil |
|
|
Berthing Tugs and Mooring Boats |
6 Tugs and 4 mooring boats |
|
|
Pilot Boats |
4 |
||
Water Barges |
14 – 40 MT Capacity |
||
Police Boats |
Yes. |
||
Anti-pollution Boats |
Yes (Tugs and Mooring Boats ) |
||
Speed Boats |
Yes |
The two Port Sudan berths handling bulk cement in the North quays are 98.3 meters long with alongside depth of 8.7 meters. The North quays have 27 stores covering 57, 000 M2, designed to handle up to five million tons of cargo per year. The North quays also include two berths of 122 meters with alongside depth of 6.1 meters for barges used to export livestock.
North Quay |
|||
Berth Number |
Length / meter |
Draft / meter |
Purpose |
1-2-3-4-5 |
597 |
8.5 |
General cargo, molasses, bulk cement |
5 A |
229.8 |
9.5 |
Molasses, cement, general cargo |
6 – 7 |
365.7 |
10.7 |
Bulk cement, general cargo |
8 – 9 |
365.7 |
10.7 |
Edible oils, general cargo |
11 |
106.7 |
8.5 |
General cargo, bulk cement |
12 |
201.8 |
8.5 |
General cargo, bulk cement |
General Cargo Handling Berths
General Cargo – Imports |
Berths |
Imports – Bagged Cargo |
1-14 and 15 |
Exports – Bagged Cargo |
1-14 and 15 |
Imports – Steel Goods |
1-14 and 15 |
Imports and Exports – Ro-Ro |
16 |
Imports – Vehicles |
4 and 5 |
Others Imports |
A suitable berth will be allocated based on cargo characteristics, vessels configuration and draft. |
Port Handling Equipment
A private company, the Sea Ports Corporation (SPC), manages the port equipment. The SPC is an independent state corporation of Sudan that governs & maintains the ports and the harbours. The Port handling equipment is generally in good condition, but the fixed general cargo “Luffing” cranes with a capacity between 5 and 15 metric tons are in poor condition.
It is a prerequisite by the Port Sudan authorities that Vessels to load and/or discharge bulk – general cargoes over the quay must be ‘geared’.
Port Cargo Handling Equipment (Operational) |
||
Appliance |
Quantity |
Capacity |
Quay Cranes – Travelling |
27 |
5-15 Metric tons |
Mobile Cranes |
11 |
20 - 70 Metric tons |
Mobile Quay Cranes |
2 |
63 - 120 Metric tons |
Aria Cranes |
2 |
5 Metric tons |
Tractor |
1 |
35 Metric tons |
Fork Lifts |
30 |
3 - 35 Metric tons |
Gantry Cranes (STS) |
8 |
40-65 Metric tons |
Rubber Tired Gantry Cranes/RTG |
23 |
40 Metric tons |
Tug Master |
5 |
50 - 75 Metric tons |
Tug masters |
17 |
50 Metric tons |
Trucks Tractors |
10 |
50 Metric tons |
Hired trucks |
45 |
50 Metric tons |
Trailers |
45 |
40 - 50 Metric tons |
Trailers |
46 |
15 - 20 Metric tons |
Shunter |
3 |
35 Metric tons |
Polling Trucks |
13 |
45 Metric tons |
Lifting equipment for stripping containers / Forklifts |
10 |
3 Metric tons |
Reach Stacker |
22 |
35 Metric tons |
Reach Stacker |
22 |
8 - 15 Metric tons |
Trucks Tractors |
10 |
50 Metric tons |
Fire Engines |
Yes |
|
Container Facilities
Reefer slots are available, in the past years the average number of reefer units that have passed through the Port Sudan amounted to an average of 300 TEUs per year. Reefer capability was not surveyed and/or linked to the cold chain.
Container Facilities |
20ft (TEU’s) |
40ft (FEU’s) |
Container Facilities |
Yes |
Yes |
Daily off-take capacity; |
250/300 TEU / day |
|
Container Freight Stations (CFS) |
Yes within the Container terminal |
Yes within the Container terminal |
Number of CFS |
One within the Port area |
One within the Port area |
Capacity of CFS |
300 |
150 |
Refrigerated Container Stations |
Yes |
Yes |
Number of Reefer Stations (connection points) |
226++ |
113++ |
Customs Guidance
To clear import cargo for consumption within Sudan, nominated clearing agents are also tasked to clear cargo in transit consigned to Chad and neighbouring countries (Ethiopia, ROSS) subject to the established customs rules & regulations and border formalities.
For information on customs, please see the following link: 1.3 Sudan Customs Information
Terminal Information
Multipurpose Terminal
The Multi-purpose terminal at the North Quay is able to handle all types of cargo subject to the vessels general configuration and draft. The discharge and/or delivery to/from Ship’s side requires pre-planning to avoid delays.
The shore luffing cranes (capacity 5 to 15 tons) are however in poor mechanical repair hence the Port Authorities require that vessels arriving at Port Sudan be suitably geared with cranes and/or derricks. Shore winch men are available.
Oil Handling Terminal - the Elkhair (Dama Dama) oil terminal can receive tankers up to 50,000 DWT with a draft of 14.5 metres. In 2017, 77 vessels used the berth, and 2,222,591 metric tons of petroleum products were imported. There were no petroleum products exported in 2017. Last petroleum exports were done in 2014.
Grain and Bulk Handling
There are five vertical silo and one horizontal silo operators within the port as follows;
- 50,000 MT capacity situated at Berth 15 - owned/operated by the Agricultural Bank of Sudan. Facility is mainly used for Sorghum exports.
- 60,000 MT silo capacity at Green Port area operated by WITA. WITA also has another 70,000 mt silo capacity 3km outside of port.
- 90,000 MT silo capacity at the Green Port area operated by SEEN Flour Mills.
- 76,000 MT silo capacity at the Green Port area owned by ALKHALEEJ but operated by SEEN.
- 140,000 MT silo capacity at the Green Port area owned/operated by DAL Foods/Sayga Flour Mills.
- 50,000 MT horizontal silo capacity at the North Quay operated by SEAGRAINS.
In total, the silo capacity at PORT SUDAN is 536,000 MT.
The method of discharge to these silo facilities is from ship’s holds with grabs or Pneumatic Buhler evacuators onto hoppers, into bulk trucks which transport and dump the bulk to the respective facility repeatedly. The daily discharge rate can get to 12,000 metric tons pwwd using Ship’s gear with four gangs.
Most of the silo operators subsequently deliver the cargo bulk to up country mills except Sayga that has a bagging option. The daily bagging rate basis 16 working hours is around 2000 metric tons.
The silo facilities have a rail connection and there is ongoing works to extend the rail to the quayside of the Green port berths.
Bagging – Grain Handling
There are two main international bagging operators operating from Port Sudan (PORTSERVE & IMGS) through local partners. These provide the conventional discharge/bagging services alongside ship using bagging plants each having two bagging lines, with sewing machines, scales and escalators to move the bags to landside stowage and/or transport. The mobile bagging machines are also hired out to the vertical or horizontal silo operators whenever they would require to deliver cargo bagged.
Discharge is mainly using ship gear, ship/own grabs and port labour. Four gangs are usually allocated to a vessel and the daily discharge is around 2500 to 3000 MT/wwd. Usually crane operators, supervisors, labour on the bagging plant, and a mechanical/electrical engineer are on standby at the vessel.
Conventional Cargo
The general cargo terminals are situated at the North Port and Green Port. These facilities are able to handle general cargo, unitised cargo, bagged, bulk, vehicles, project and heavy lift/out of gauge traffic. Cargo is discharged from ship’s holds using slings and nets by ship/shore cranes and onto the quayside from where the port labor loads it to trucks/wagons for delivery. There are also several warehouses alongside the berths that have been leased out.
Containerised Cargo (THC)
The South Port consists of six berths. Berths 13 to 18 are used for containerised cargos while berth 15 is a bulk silo loading/discharge facility.
Containers are unloaded from ships using STS gantry cranes onto terminal tractors which transfer them for stacking within the terminal. Delivery from the terminal is by RTG onto trucks that transfer containers from terminal to the customs inspection area. Lift off/on at the customs inspection area is Reach Stackers. After inspection the containers are either loaded on to trucks full or de-stuffed and shifted to the storage area doe empties.
Main Storage Terminal
Port Storage – Managed by Sea Port Corporation of Sudan |
||
Total floor space |
Quantity |
Floor area (m²) |
Main Quay Transit Sheds |
27 |
57,000 m² |
Back of Port Transit Sheds |
2 |
3,000 m² |
Lighterage Area Transit Sheds |
There are limited designated lighter age Quays or Sheds within the Port Area. The general port shed and open squares are used, if required.
|
The North quay has two berths of 122 meters with alongside depth of 6.1 meters for barges used to export livestock. |
Customs Warehouses |
The Port area is ‘Bonded’, no cargo may move in or out of the port without customs clearance. There are no reserved customs shed, the exception being the LCL sheds (6000 m²) in the South Port Container Terminal Area. |
As per Port Transit Sheds. |
Stevedoring
Labour working inside the ship and for stacking cargo on trucks is engaged and paid for by the ship agent, clearing agent or transporter. Port labour however handle cargo at the quayside. The wages paid to shore side labour is negotiated with the Unions and tariffs are calculated based on cargo configuration.
Hinterland Information
Commodities are moved out of the port by rail or road. Delivery is mostly through primary transporters, local shunting and direct deliveries to the main hubs. Direct deliveries have been performed to Khartoum, El Obeid, Fasher, Nyala and Kosti. Direct deliveries from Port Sudan Warehouse to minor hubs like Damazine, Kasalla etc are also possible.
Port Security
The Port is ISPS compliant. All entry points are secured, manned by Port Police and Customs Officers and access is subject to permits (usually given within one day by the Port Sudan Authorities after presentation of original identification documents and letter of request).
Security |
|
ISPS Compliant |
Yes |
ISPS Level (current) |
1 (Normal) |
The fenced and secured port area is ‘customs bonded’: no cargo may enter or leave the port area without the requisite customs and associated documentation being completed and approved through the Customs Controls.
The ships in the port have their own security and ‘gangway watch’.
In addition, there are two secondary/tertiary Sudanese Ports on the Red Sea that function as alternative port gateways to the Republic of Sudan, these are Osman Digna port at Sawakin (South of Port Sudan) and Bashair port.
2.2 Sudan Aviation
Key airport information may also be found at: http://worldaerodata.com/
Civil Aviation
Airports in Sudan are grouped into three categories and the criterion applied is as follows:
a) Primary/Major International Aerodromes - The aerodrome of entry and departure for International air traffic, where all formalities concerning customs, immigration, health, animal and plant quarantine and similar procedures are carried out and where traffic services are available on a regular basis. Khartoum International Airport is the primary air gateway to the Republic of Sudan, situated in Khartoum.
b) Secondary/Other International Aerodromes – Aerodromes available for the entry of International air traffic, where the formalities concerning customs, immigration, health and similar procedures and air traffic services are made available, on a restricted basis, to flights with prior approval only.
c) National Aerodrome – Aerodromes available only for domestic air traffic, including those Military aerodromes where civil air traffic is permitted under certain conditions.
For more information on government agency and airport company contact information, please see the following links:
4.1 Sudan Government Contact List
4.5 Sudan Airport Companies Contacts List
Procedures for Foreign Registered Aircraft
In the Republic of Sudan, the following requirements need to be applied, presented and approved before the preposition of a foreign registered aircraft.
The application to position and operate an aircraft in Sudan is submitted through the Ministry of Foreign Affairs, who in turn pass on to the Civil Aviation Authority.The application of airworthiness defines the condition of an aircraft and supplies the basis for judgment of the suitability for flight of the particular aircraft.The aircraft should not be more than 20 years old.
An aircraft that is positioned to operate in Sudan must have Valid Airworthy and related certificates, maintenance records. CAA will inspect the aircraft and all documentation, once satisfied the aircraft will be passed to operate within Sudan.
- Conforms to the Type Design approved under a Type Certificate, and any applicable Supplement Type Certificate, and to applicable Airworthiness Directives.
- The aircraft has been inspected with the appropriate airworthiness requirements.
- The CAA of the Republic of Sudan confirms that the aircraft type, design and is in a condition for safe operation within Sudan.
Regular intermediary inspections are made by CAA, this includes regular maintenance and services and the 6 monthly airworthy inspections.
The flight crews are interviewed, and certifications are checked by CAA, before an aircraft is authorised to operate within the Republic of Sudan.
Flight crew requires visas to enter and operate in Sudan, process that usually takes around two weeks.
UNHAS
The United Nations Humanitarian Air Services (UNHAS) is a humanitarian air service, established and managed by WFP.
UNHAS in Sudan relies on a fleet of six aircrafts (2 contracted and 1 ad hoc fixed wing aircraft and 3 helicopters) based in Khartoum, El Obeid, El Fasher and Geneina. UNHAS provides services to over 100 user entities comprising NGOs, UN agencies, donors, the diplomatic community and humanitarian implementing partners. On average, UNHAS transports 3,350 passengers and 15 MTs of cargo per month to over 40 locations.The majority of UNHAS flights serves Darfur and connections from Khartoum and the three Darfur state capitals. To support the refugee and IDP activities in Central and Eastern States of Sudan, UNHAS updated its weekly schedule in December 2018 to accommodate users flying to South and West Kordofan and Blue Nile States. UNHAS also supports light cargo air services as well as timely medical and security evacuations on behalf of the whole humanitarian community in Sudan.
2.2.1 Sudan Khartoum International Airport
General Overview
Khartoum International Airport is the primary air gateway to the Republic of Sudan, situated in Khartoum, the Capital of Sudan.
Khartoum International Airport functions under the operating constraints of the high temperature, thus the quiet period for the airport is 1200 hours to 1700 hours, the busy period is from 1700 hours through to 0500 hours with the inward and outward passenger and freight movement.
Location Details |
|||
Country |
Republic of Sudan |
Latitude |
15o 35’ 22.19” N |
Province / District |
Khartoum State |
Longitude |
32o 33’11.38”E |
Town or City (closest) |
Khartoum |
Elevation |
1265ft/386m |
Airfield Name |
Khartoum International Airport |
International airport |
Yes |
IATA and ICAO codes |
KRT HSSS |
Open from/to (hours) |
24 hours |
Description and Contacts of Key Companies
Company Name and Address |
Contact Names and Email |
Telephone and Fax |
Saudi
Airways Khartoum International Airport |
|
|
Sudan Airways |
Email: customerinfo@sudanair.com |
|
Special Flight
Services |
Email: sfs@sudanair.com |
Tel: +249183243770 Fax: +249183243723 |
Ground Handling
Services |
Email: sfs@sudanair.com
|
Tel: +249183781423 Fax: +249183779781 |
Maks Aviation
Services |
Name: Mr. Rifaat Masoud Title: CEO |
Tel: +249912397277 Fax: |
Aramex
International |
Name: Hind Hussein Email: hind.hussein@aramex.com Web: www.aramex.com |
Tel: + 249183480666 Ext 1019 Mobile : + 249912178604 |
Information on some aviation service providers can be found at: http://www.azfreight.com/
Runways
There is one runway 18/36 with two landing approaches at Khartoum International Airport.
Runway 18 / 36 |
|
Published Length (m) |
9777 ft / 2980 metres |
Usable Length (m) |
- |
Width (m) |
45 meters |
Orientation |
18/36 |
Surface |
Asphalt |
Helipad(s)
There are no designated Helicopter Pads.
Helipad |
|
Present |
No. There is no helipad, helicopters land on the main runway and park in a designated area. |
Maximum permitted |
MI 26 – No restrictions |
Width and Length (meters) |
Length is 2980 metres. The runway width is 45 metres |
Surface |
Asphalt |
Airport Infrastructure Details
Airfield Details |
|||
Customs |
Yes |
JET A-1 fuel |
Yes |
Immigration |
Yes |
AVGAS 100 |
No |
Terminal Building |
Yes |
Single Point Refuelling |
Yes |
Passenger Terminal |
Yes |
Air Starter Units |
Yes |
Cargo terminal |
Yes |
Ground Power (mobile) |
Yes |
Pax transport to airfield |
Yes |
Crash Crew |
Yes |
Control Tower |
Yes |
Aircraft Support Services |
Yes |
Weather Facilities |
Yes |
Latrine Servicing |
Yes |
Catering Services |
Yes |
Fire Fighting |
Yes |
Base Operating Room |
Yes |
Fire Fighting Category (ICAO) |
|
Airport Radar |
Yes |
Fire Fighting Equipment |
Yes |
NDB |
Yes |
De-icing Equipment |
No |
VOR |
Yes |
IFR Procedures |
Yes |
ILS |
Yes |
Runway Lights |
Yes |
Approach Lights |
Yes |
Parking Ramp Lighting |
Yes |
Passenger and Cargo Performance Indicator
The airport’s peak time is during the late evening and early hours of the mornings when the temperature is lower and the aircrafts operate to optimum payloads.
Performance |
Year 2017 |
Total aircraft movements |
33028 |
Total passengers |
3,563,181 |
Current monthly use by Humanitarian flights (UNHAS) |
40,557 Passengers/ 3,380 passenger per month |
Cargo Capacity
Inward cargo aircraft as a norm arrive during the night when it is cooler, discharge and in most instances rotate out of Khartoum in ballast.
Capacity Cargo |
Year 2017 |
Total aircraft movements |
34,250 |
Total capacity of the airport (metric tonnes) |
N/A |
Current activity of the airport (metric tonnes) |
32,666,063 MT in 2017. (Commercial traffic) |
Current monthly use by Humanitarian flights (UNHAS) |
165.578 Kg Cargo / 13.80 mt Cargo monthly |
Airport Operating Details
Airport Operating Details |
||||||||
Max size aircraft that can be offloaded on bulk cargo |
AN 124, C17, IL 76 |
|||||||
Max size cargo aircraft that can be offloaded on pallet |
B747 – 400 |
|||||||
Total Parking Area |
m² |
N/A |
||||||
Storage Capacity |
MT |
40 Metric tons within the Airport secured perimeter. |
||||||
Cargo Handling Equipment |
Yes |
|
Forklifts, conveyor belts, K-Loaders / elevators, dollies |
|||||
Elevators / K-loaders |
Yes |
Max. Capacity: |
7 and 15 Tons |
MT |
Can reach the upper deck of B747? |
Yes |
||
Loading Ramps |
No - Use Elevators and conveyor belts |
Storage Facilities
Khartoum International Airport has storage space for approximately 40 tons, this is short-term storage pending moving the cargo from the airport to Clearing agents warehouses. There is limited cold storage space available at the airport.
Airfield Costs
Airfield Charges (US$) |
||||||
Aircraft Weight – MTOW (kg) |
Landing |
Night Landing |
Night Take-off |
Parking, every 6 hours or part thereof |
||
0 |
1,500 |
C 172 |
$ 70.00 |
+15%of LF |
Included in NS |
$15 |
1,501 |
2,500 |
C 205 |
$ 70.00 |
+15%of LF |
Included in NS |
$15 |
2,501 |
5,000 |
C 208 |
$ 70.00 |
+15%of LF |
Included in NS |
$15 |
5,001 |
10,000 |
DC-3 |
$90.00 |
+15%of LF |
Included in NS |
$15 |
10,001 |
20,000 |
Dash-7 |
$6/Ton |
+15%of LF |
Included in NS |
$15 |
20,001 |
40,000 |
Dash-8 |
$6/Ton |
+15%of LF |
Included in NS |
$30 |
40,001 |
80,000 |
An-12 |
$6/Ton |
+15%of LF |
Included in NS |
$45 |
80,001 |
120,000 |
B757 |
$6/Ton |
+15%of LF |
Included in NS |
$60 |
120,001 |
180,000 |
B767 |
$6/Ton |
+15%of LF |
Included in NS |
$75 |
180,001 |
300,000 |
IL-76 |
$6/Ton |
+15%of LF |
Included in NS |
$90 |
300,001 |
and over |
An-124 |
$6/Ton |
+15%of LF |
Included in NS |
$90 |
Note 1: Night landing hours are between 1900 to 0700 hours. |
||||||
Note 2: Parking charges are for each six hours or part thereof. |
||||||
Note 3: All of these charges are administered by the Department of Civil Aviation and apply to all airports in Sudan. |
Navigation Charges
Navigation Charges (US$) |
|||
Aircraft Weight – MTOW (kg) |
Navigation (per journey) |
Over-Flight |
|
0 |
3,500 |
25% of Landing Charges |
CHF 1,800 |
3,501 |
10,000 |
25% of Landing Charges |
CHF 1,800 |
10,001 |
20,000 |
25% of Landing Charges |
CHF 1,800 |
20,001 |
50,000 |
25% of Landing Charges |
CHF 1,800 |
50,001 |
100,000 |
25% of Landing Charges |
CHF 2,400 |
100,001 |
200,000 |
25% of Landing Charges |
CHF 2,400 |
200,001 |
and over |
25% of Landing Charges |
CHF2,700 |
Fuel Services Charges
The below fuel charges for JET A1 are an average over the six months (end 2015 – beginning 2016)
LOCATION and SDG
Khartoum 4.55 litres (lt)
El Obeid 6.08 lt
El Fasher 9.20 lt
Nyala 9.26 lt
Drummed fuel in Khartoum 910 per drum (200 lt)
Drummed fuel El Obeid 1210 per drum (200 lt)
Cargo Terminal Charges
Cargo Terminal Charges |
|
Import |
Rate US$ / kg |
Handling Charge per kg |
Included in Handling Charges |
Break Bulk Fee |
Included in Handling Charges |
Diplomatic Mail |
Included in Handling Charges |
Strong Room – per consignment |
On request |
Cold Storage Fee |
There is limited cold storage space |
Delivery outside normal working hours |
Included in Handling Charges |
Preparation of substitute AOA – Invoice – Receipt |
N/A |
Storage per kg per day – Grace period? Hours |
Currently $0.14 per day or part thereof. No Free Period |
Export |
Rate US$ / kg |
Handling charges – Unpalletized cargo |
Included in Handling Charges |
International Air Way Bill |
$ 100.00 per Airway Bill Issued |
Local Air Way Bill |
N/A |
Air Way Bill Amendment – Cancellation |
$ 20.00 per Amendment or cancellation fee |
Air Way Bill Documentation |
N/A |
Diplomatic Mail |
N/A |
Storage charges per kg per day |
Presently $0.14 per day or part thereof. No Free Period |
Air-bridge Charges
There are no air bridges, passengers are conveyed to/from terminals/aircraft by bus.
Aircraft Handling Charges
Aircraft Handling Schedule |
|||
Aircraft Weight – MTOW kgs |
Charges (US$) |
||
0 |
1,500 |
C 172 |
$250.00 |
1,501 |
2,500 |
C 205 |
$250.00 |
2,501 |
5,000 |
C 208 |
$250.00 |
5,001 |
10,000 |
DC-3 |
$500.00 |
10,001 |
20,000 |
Dash-7 |
$500.00 |
20,001 |
40,000 |
Dash-8 |
$500.00 |
40,001 |
80,000 |
An-12 |
$1,000.00 |
80,001 |
120,000 |
B757 |
$1250.00 |
120,001 |
180,000 |
B767 |
$1,600.00 |
180,001 |
300,000 |
IL-76 |
$2000.00 |
300,001 |
and over |
An-124 |
$3500.00 |
List of ground handling equipment owned by the supplier (MAKs):
Item |
Hourly daily rate / SDG |
Ground Power unit |
SDG 2,400 + VAT |
Fork Lift (10 Tons) |
SDG 1,225 + VAT |
Fork Lift (1.5 Tons) |
SDG 590 + VAT |
Air Conditioning Unit (110 Tons) |
SDG 4,000 + VAT |
Toilet Service |
SDG 900 + VAT (per sevice) |
Water Service (none drinking water) |
SDG 900 + VAT (per service) |
Conveyor belt |
SDG 590 + VAT |
Passengers stairs |
SDG 1,050 + VAT |
Cargo Dollies |
SDG 130 + VAT |
FMC hi-loader LDL |
SDG 1,980 + VAT |
FMC hi-loader MDL |
SDG 3,025 + VAT |
Ramp Vehicle |
SDG 395 + VAT |
Vacuum cleaner |
SDG 195 + VAT |
Air starting unit |
SDG 2,700 + VAT (per start) |
Aircraft Servicing Charges:
Aircraft Servicing Charges |
|
Service |
Ad-Hoc / US$ |
Chocks per operation |
Included in Handling Charges |
Stairs per unit per hour |
$150 per Hour – One Hour included in Handling Charges |
GPU per hour |
$200.00 per hour |
ASU per hour |
One hour $ 400.00, two hours $ 600.00 |
Loader per hour |
LDL $ 400, MDL 600 Per Hour or part thereof, One hour included in Handling charges. |
Toilet Service per aircraft |
$75.00 |
Pushback per operation |
$175 per operation. |
Trailer/dolly per operation |
Tug $ 100.00, Dolly $ 20.00 |
Security
Security of the airport is managed by the Department of Civil Aviation. The security is good; all accesses for passengers, freight, services and maintenance units are controlled, and all official personnel are required to wear identification badges. Passenger monitoring and luggage x-rays are in place at all access points before accessing the flights check in terminal.
Security charges International Departures:
Less than 5 Tons $50.00
5 - 10 Tons $60.00
10 - 25 Tons $80.00
25 - 60 Tons $100.00
60 Tons+ $150.00
Security charges to the Air carrier for Domestic Departures:
Less than 5 Tons $40.00
5 - 10 Tons $50.00
10 - 25 Tons $70.00
25 - 60 Tons $80.00
60 Tons+ $90.00
2.2.2 Sudan El Geneina National Airport
El Geneina new airport is a public airport that is operated by the government and serves El Geneina, the capital of Western Darfur State. It highly improved the logistic capacity in the state.
The new airport is accessible through asphalt road and accessible all year round after the construction of two bridges early 2018 that enables uninterrupted movement during rainy seasons. Constraint to be considered is the security on the extended road. The Airport is used by UNAMID, UNHAS and other commercial operators. UNAMID have a separate passenger terminal while WFP has an office within the limited terminal buildings and support structure. The Airport Authority operates the airport from 0800 hours to 1500 hours.
For information on airport company contact details for Sudan, please see the following link: 4.5 Sudan Airport Companies Contacts List
EL GENEINA Airport |
||||
Country |
Sudan |
Latitude |
130 29’15.9 “ N |
|
Province / District |
Western Darfur |
Longitude |
022O 23’48 E |
|
Town or City (closest) |
El Geneina |
Elevation (ft) |
808 |
|
Airfield Name |
El Geneina (New Airport) |
Surface |
Asphalt |
|
IATA and ICAO codes |
EGN HSGN |
Condition |
Good |
|
Runway Length (m) |
2994 |
Runway Width (m) |
45 metres |
|
Orientation |
04 - 22 |
Lighting |
Yes (planned) |
Airlines |
Destinations |
Badr Airlines |
Khartoum |
Tarco Airlines |
Khartoum |
Reference: Airport information for HSGN
2.2.3 Sudan El Fasher National Airport
El Fasher Airport is a public airport managed by the Government of Sudan and serves El Fasher, the capital city of the North Darfur State. It has 2 runways: 05/23 with an asphalt surface measuring 2,970 by 45 meters (9,744 feet x 148 feet) and 18/36 with a gravel surface measuring 1,527 by 45 meters (5,010 feet x 148 feet).
For information on airport company contact details for Sudan, please see the following link: 4.5 Sudan Airport Companies Contacts List
EL FASHER Airport |
||||
Country |
Sudan |
Latitude |
13 O 36’53.61” N |
|
Province / District |
Northern Darfur |
Longitude |
0250 19’28.74”E |
|
Town or City (closest) |
El Fasher |
Elevation (ft) |
2,393 Feet /729 meters |
|
Airfield Name |
El Fasher |
Surface |
Asphalt |
|
IATA and ICAO codes |
ELF HSFS |
Condition |
Good |
|
Runway Length (m) |
2,970 + Alternative Runway 18/36 Gravel strip, Length 1527 meters, Width 45 meters |
Runway Width (m) |
45 |
|
Orientation |
|
Lighting |
Airlines |
Destinations |
Badr Airlines |
Khartoum |
Nova Airways |
Khartoum, Nyala |
TAR COP |
Khartoum |
Reference: Airport information for HSFS
2.2.4 Sudan Nyala National Airport
Nyala Airport is in Nyala town, the capital of South Darfur State.
For information on Sudan airport contact details, please see the following link: 4.5 Sudan Airport Companies Contacts List
NYALA Airport |
||||
Country |
Sudan |
Latitude |
120 03’12.56”N |
|
Province / District |
Southern Darfur |
Longitude |
0240 57’22.05”e |
|
Town or City (closest) |
Nyala |
Elevation (ft) |
2,106 Feet |
|
Airfield Name |
Nyala |
Surface |
Asphalt |
|
IATA and ICAO codes |
UYL HSNN |
Condition |
Good |
|
Runway Length (m) |
3003 metres |
Runway Width (m) |
45 metres |
|
Orientation |
|
Lighting |
No |
Airlines |
Destinations |
Badr Airlines |
Khartoum |
Nova Airlines |
El Fasher, Khartoum |
Sudan Airways |
El Obeid, Khartoum |
Tarco Airlines |
Khartoum |
2.2.5 Sudan Port Sudan Airport
Port Sudan International Airport was built in 1992 and has the capacity to accommodate international flights, with a designated International Terminal. Customs, immigration and Port Health are onsite. Port Sudan International Airport is the secondary airport of Sudan (after Khartoum).
Port Sudan new International Airport is a public airport that is owned and operated by the Government of Sudan. It is the second largest international airport in Sudan in terms of air traffic and international destinations served. It is located 20 km south of Port Sudan. Port Sudan New International Airport is a full member of the IATA as of 2014.
For information on airport company contact details for Sudan, please see the following link: 4.5 Sudan Airport Companies Contacts List
PORT SUDAN Airport |
||||
Country |
Sudan |
Latitude |
037O 14” O6.76”E |
|
Province / District |
Red Sea |
Longitude |
19O 22” 01.1” N |
|
Town or City (closest) |
Port Sudan (26 km) |
Elevation (ft) |
142 feet |
|
Airfield Name |
Port Sudan Int. Airport |
Surface |
Asphalt |
|
IATA and ICAO codes |
PZU HSPN |
Condition |
Good |
|
Runway Length (m) |
2,500 meters |
Runway Width (m) |
45 meters |
|
Orientation |
|
Lighting |
Yes |
Airlines |
Destinations |
Badr Airlines |
Khartoum |
Flydubai |
Dubai-International, Khartoum |
Nile Air |
Cairo |
Nova Airways |
Khartoum |
Sudan Airways |
Cairo, Jeddah, Khartoum |
2.2.6 Sudan El Obeid National Airport
El Obeid Airport serves El Obeid, the capital city of North Kordofan State. It is a public airport, operated by the government. Customs and immigration are available at the airport terminal.
For information on airport company contact details for Sudan, please see the following link: 4.5 Sudan Airport Companies Contacts List
EL OBEID Airport |
||||
Country |
Sudan |
Latitude |
030O 13 ‘57.72” E |
|
Province / District |
North Kordofan |
Longitude |
13o 09’ 10.44” N |
|
Town or City (closest) |
El Obeid |
Elevation (ft) |
1,927 feet – 593.5 metres |
|
Airfield Name |
El Obeid International Airport |
Surface |
Asphalt |
|
IATA and ICAO codes |
OBD - HSOB |
Condition |
Good |
|
Runway Length (m) |
2991 metres |
Runway Width (m) |
45 metres |
|
Orientation |
RWY 01 – RWY 19 |
Lighting |
Yes |
Airlines |
Destinations |
Badr Airlines |
Khartoum |
.
2.3 Sudan Road Network
For more information on contact details, please see the following link: 4.1 Sudan Government Contact List
The Republic of Sudan’s road network covers approximately 30,000 km of road, of which 7,000 km are asphalted, 4300 km are gravelled. In addition to urban roads and urban programmes total an additional 1,000 km of paved road.
Distance Matrix
Distances from Capital City to Major Towns (km) |
||||||||
Khartoum |
Capital |
El Obeid |
Kosti |
Port Sudan |
Nyala |
El Fasher |
El Geneina |
Kadugli |
Khartoum |
|
620 |
300 |
1120 |
1356 |
1270 |
1706 |
920 |
El Obeid |
620 |
|
620 |
1740 |
730 |
642 |
1078 |
278 |
Kosti |
300 |
300 |
|
1440 |
680 |
880 |
1700 |
320 |
Port Sudan |
1120 |
1740 |
1420 |
|
2420 |
2420 |
2770 |
2040 |
Nyala |
1356 |
730 |
1000 |
2420 |
|
190 |
370 |
980 |
El Fasher |
1270 |
642 |
880 |
2420 |
190 |
|
360 |
880 |
El Geneina |
1706 |
1078 |
1700 |
2770 |
370 |
360 |
|
1330 |
Kadugli |
920 |
278 |
620 |
2040 |
980 |
880 |
1330 |
|
Travel time has been calculated on the average speed of 50 km per hour (considering status of roads) plus 25% to cover rest periods and usual breaks in the route.
The worst case scenarios will need to factor in prolonged delays due to road conditions, the rainy season (May to October), delays of convoys and escorts, and potential mechanical failures.
Travel Time from Capital City to Major Towns (Hours / Days) |
||||||||
|
Capital |
El Obeid |
Kosti |
Port Sudan |
Nyala |
El Fasher |
El Geneina |
Kadugli |
Khartoum |
|
8 Hours |
4 Hours |
3 Days |
4 Days |
2 days |
4 Days |
1 day |
El Obeid |
1 day |
|
4 Hours |
4 days |
3 days |
1 day |
3 days |
3 Hours |
Kosti |
1 Day |
4 Hours |
|
3 days |
4 days |
2 days |
4 days |
6 Hours |
Port Sudan |
3 Days |
4 days |
3 days |
|
7 days |
5 days |
7 days |
5 days |
Nyala |
3 Days |
3 days |
4 days |
7days |
|
2 days |
2 days |
4 days |
El Fasher |
3 Days |
One day |
2 days |
5 days |
2 days |
|
2 days |
2 days |
El Geneina |
4 Days |
3 days |
4 days |
7 days |
2 days |
2 days |
|
4 days |
Kadugli |
1 Day |
3 Hours |
6 Hours |
5 days |
4 days |
2 days |
4 days |
|
Road Security
The security requirements and scenarios vary depending on the routes. All road transportation requires security clearance from HAC, NISS and MCS, with for UN agencies oversight from UNDSS and from the Security units of each UN Agency. On specific routes, road haulers are required to move under convoy with security from UNAMID and/or Sudanese Police or Army. Convoys and the related escorts must be arranged well in advance with UNAMID and/or the relevant authority. All clearances must be arranged through HAC, NISS and MCS.
In addition the prevailing seasonal weather conditions must also be taken into consideration, wash ways, flooded rivers that cause roads to be impassable, the presence of animals on the road (camels, livestock) and the bad conditions of several roads (potholes etc.). The distances are vast, there is negligible roadside support in case of accidents or breakdowns, and thus it is important to adhere to security procedures and standards.
Weighbridges and Axle Load Limits
The National Highway Authority ensures that road vehicles are laden based on axle distribution. Weighbridges are positioned in strategic locations to enforce safety and legislation on ‘safe working loads/limits’.
The Sudanese Chamber of Transport Union advises that the maximum axle load limitations for road trucks on Sudan roads are:
Axle load limits |
Sudan |
Chad |
Truck with 2 axles |
16 Metric tons |
21 Metric Tons |
Truck with 3 axles |
24 Metric Tons |
27 Metric tons |
Truck with 4 axles |
32 Metric Tons |
|
Semi-trailer with 3 axles |
- |
- |
Semi-trailer with 4 axles |
- |
- |
Semi-trailer with 5 axles |
- |
- |
Semi-trailer with 6 axles |
- |
- |
Truck and drawbar trailer with 4 axles |
- |
- |
Truck and drawbar trailer with 5 axles |
- |
- |
Truck and drawbar trailer with 6 axles |
- |
- |
Truck and drawbar trailer with 7 axles |
- |
- |
New regulation in 2017 stipulated that the maximum load limit is 54 mt.
Loading dimensions should not exceed 3 metres in height and 2.5 metres in width; any loading exceeding these parameters may be considered as “abnormal loading” and may require escorts to caution other road users on dangerous ‘out of gauge‘ traffic.
CHAD: The axle weight maximum for one axle is 13 Metric Tons. The configuration of the loads should not exceed 2.5 metres (width) and 4 metres (height).
SUDAN: The axle weight maximum for one axle is 10 Metric Tons.
Road Corridor Assessments
The following table shows WFP corridors inside Sudan for both WFP fleet and commercial transporters convoys:
Origin |
Destinations |
Port Sudan |
Khartoum, El Obeid, Kassala, Ed Damazine |
Khartoum |
El Fasher, Nyala, Geneina, Ed Daein, El Obeid |
El Obeid |
El Fasher, Ed Daien, Nyala, Mukjar, Geneina, Kadugli |
Nyala |
El Fasher, Geneina |
Geneina |
Ed Daein |
From El Obeid to El Fasher
El Obeid is the main intermediate hub for food aid going to Western Sudan (Darfur); it represents one of the primary hubs in Sudan for both commercial and WFP operations, due to its central geographical location, that links the port in the East to the Western and Southern areas of the country. Therefore, most of transport companies in Sudan have a representative/branch office in El Obeid to facilitate their transport business to West and South Sudan.
The main road from El Obeid to El Fasher is a paved/asphalt highway and is accessible throughout the year to all types of traffic. This road is safe and there is no need for escorts for both WFP fleet and commercial trucks. The journey route is El Obeid – En Nuhud – Dam Jamad – Um Kadada – Al Koma – El Fasher. Starting point of the escort is in Darfur (El Fasher) – Zalingei – Morni – El Geneina.
General information:
Total distance (km or miles) |
642 Km |
Total travel time |
One day |
Road classification |
Asphalt |
Security (Good, marginal, bad) |
Marginal |
Main towns/hubs |
El Nuhud |
From El Obeid to Nyala:
The main road from El Obeid to Nyala is paved/asphalt up to El Nuhud town (206 Km) while the rest (474 Km) is dirt. The dirt part of the road is usually blocked during rainy season in some parts. The journey route is El Obeid – Babanosa – Ed Daein – Nyala (starting point of the escort as the next point will be in Darfur) – Zalingei – Morni – El Geneina. Some routes can be accessed during the dry season only, while there are alternative roads that are used during the rainy season. The rainy season affects transport rates as transporters have to depend on longer routes so as to reach the inaccessible destinations, resulting in an increase of transportation rates by nearly 20% to 25% compared to the dry season rates.
General information:
Total distance (km or miles) |
730 Km |
Total travel time |
3 days |
Road classification |
Asphalt (2016 Km) + dirt (474 Km) |
Security (Good, marginal, bad) |
Marginal |
Main towns/hubs |
El Nuhud |
From El Obeid to Kadugli
The main road from El Obeid to Kadugli is tarmac and accessible to all traffic. However, El Obeid to Abu Jebeeha, Kalogi and Talodi is only useable in the dry season.
General information
Total distance (km or miles) |
287 Km |
Total travel time |
3 Hours |
Road classification |
Tarmac |
Security (Good, marginal, bad) |
Marginal |
Main towns/hubs |
El Dalanj |
From El Fasher to El Geneina
The main road from El Fasher to El Geneina is gravel, and is accessible only during the dry season. It is suitable only for heavy trucks (15 – 23 MTs) without trailer as well as light vehicles pick-up (4WD).
General information:
Total distance (km or miles) |
360 Km |
Total travel time |
2 days |
Road classification |
Dirt |
Security (Good, marginal, bad) |
Bad |
Main towns/hubs |
Kutum, Saraf Omra |
Escorting
Escorting trucks is very important to ensure the safe delivery of commodities and cargo. Insecurity can impact dispatches to conflict areas resulting in delays in delivery, high transport rates, and high level of losses.
Government of Sudan police usually organises and conducts military escort to protect fuel tankers passing through Darfur states. Also trucks that carry dry cargo are included in this type of escorting which can involve up to 500 vehicles.
Escorts movement usually takes place three times per month (the gap between each escort and next one is 10 days), but sometimes movements are affected by the readiness and actual security situation in the respective area. The allowed average speed for the escorted trucks is 50 to 70 Km/hour during the daylight and no trucks movement is allowed during night hours.
Obstacles and bridges
Mines/UXO |
Under review and reporting by UNMAS, UNAMID and UNISFA. |
Road block |
Gateways to major cities, Town and main road junctions |
Check point – official |
Gateways to major cities, Town and main road junctions |
Check point – unofficial |
There are ‘unofficial road ‘blocks ‘set and removed without notice. |
Debris/wreckage |
There is no permanent debris – wreckage that inhibit movements |
Downed electrical lines |
Nil – Lines in the rural areas are generally away from Roads. |
Avalanche/snow |
No |
Landslide/Mudslide |
Occur during the rains (May – October) |
Ice |
No |
Flooded |
From May to October, wadis flood may lead to impossible movement on secondary, tertiary roads for periods of time. |
Wet crossing |
Causeways and culverts may be submerged during the rains, Rivers and Wadis may encroach over the low bridges, culverts and roads. |
Road damage |
Sections of roads may be eroded during the rains, on the main arterial roads, potholes are evident, on gradients and intersection, and the roads tend to ‘corrugate’ due to the traction of heavily laden commercial carriers. |
Bridge |
Commercial vehicles have restricted timeframes to cross the bridges into Khartoum in order to reduce the traffic congestion. |
Culvert |
|
Traffic restriction |
Commercial vehicles have restricted timeframes to cross the bridges into Khartoum in order to reduce the traffic congestion. |
Other – please specify |
All road movements are subject to security clearance from internal UN procedures and HAC, NISS and MCI. |
2.3.1 Sudan Land Border Crossings
The significant international corridor for transit traffic is through the gateway Port of Port Sudan, a multi-faceted port that is able to receive and dispatch traffic by road, rail, linking to barges and combinations thereof:
- Port Sudan to Chad.
- Port Sudan to Ethiopia
- Port Sudan to the Republic of South Sudan, through combinations of Rail, Road and River barges.
There are no ‘cost’ or ‘time’ effective corridors into the Republic of Sudan, from the neighbouring countries.
There are road corridors into South Sudan from Sudan. These routes are currently used by WFP to deliver humanitarian relief items to South Sudan, based on an agreement signed between the two respective governments in June 2014 authorising the movement of humanitarian assistance from Sudan to conflict affected communities in South Sudan. The MoU designates WFP as the sole agency responsible for the transportation of humanitarian cargo from Sudan to South Sudan.
Sudan - 2.4 Sudan Railway Assessment
General overview
Sudan Railways Corporation is one of the longest railways in Africa. It operates a 4578 km long single line of 1067 mm (3’6”) Gauge. The railway main route extends from Port Sudan via Atbara to Khartoum with an alternate link between Haya and Sennar via Kassala. There are branch lines north to Karima and Wadi Halfa. Also from Khartoum the line runs southwest to El Obeid via Sennar and Kosti with extensions to Nayala in Southern Darfur and Wau in Western Bahr Al Gazal (South Sudan).
The latest extensions include new lines for transportation of crude oil constructed between El Mujlad and Abu Gabra (52 Km), between the refinery in Abu Khrais and El Obeid station (10 Km), and Marawi Dam branch line from El Ban station.
The Sudanese Railway Corporation owns 48 train-heads and 2746 wagons of various capacities and shapes (flat, silos and cargo). Between the period 2013 – 2016, the corporation imported 29 train-heads and 652 wagons of various capacities. The renovation process is currently on going for the railway line between Khartoum and Port Sudan, 882 Km renovated so far, remaining 150 Km and the official opening is expected to take place by end 2016. When the renovation project completes, the journey between PZU and Nyala will take only 7 days. All the trains / stations are connected with GPS system. The railway line between Port Sudan and Kosti is operating and ready to use. The only railway route linked with South Sudan is via Babanousa (West Kordofan State) to Wau (South Sudan). The rail map includes the links through to the Republic of South Sudan although it is presently inoperative.
The Sudan Railways falls under the Ministry of Transport. For additional information, please see the following links:
4.1 Sudan Government Contact List
4.9 Sudan Railway Companies Contact List
Railway Companies and Consortia
Private Sector Consortium comprised of 222,522 freight tons, which makes up 21.1 % of the total freight carried on Sudan Railways Corporation, is spread out as scheduled
Company |
Tonnage (Mt) |
El Baziim |
6,500 |
Sikakyoon |
12.040 |
Sar |
70,805 |
Nafra |
29,225 |
Sayga |
101,444 |
Free Markets |
0 |
El Affregya |
2,508 |
In 2011/2012, Sudan Railways Corporation suspended all passenger services. The implementation of the planned rehabilitation and the modernisation of the railway system will reduce the dependence movements by road and the targeted outcome is to reduce the overall costs of transporting freight and passengers.
Capacity Table
Rail Operator Capacity |
|||
|
African Railways |
Albazim for Express Cargo |
SAR Railway Services |
Operates on (lines) |
Single |
Single |
Single |
Max train length and/or pulling capacity |
14 Rail wagons about 980 Metric tons gross. |
n/a |
n/a |
Locomotives (electric/diesel/steam) |
145 Mainline Locomotives, 33 shunting Locomotives |
17 (7 operative) |
6 (2300hp) and 4 (1800hp) |
Freight Wagons (covered) / size |
1425 - Capacity 35 tons ( 12 metres by 2.5 metres ) |
150 (total) |
100 |
Freight Wagons (flat bed) / size |
287 Tank Wagons (35,000 litres ) and 471 Flatbed (12 metres by 2.5 metres) |
n/a |
55 |
Freight Wagons (high-sided)/size |
|
n/a |
20 (open top) |
Freight Wagons (drop-side)/size |
581 |
n/a |
n/a |
Tonnage per month |
Port Sudan - Nyala: 2,000mt per month Port Sudan - El Obeid; 4,000mt per month El Obeid - Nyala: 3,000mt per month |
20,000 mt per month on the routes Khartoum, Port Sudan, El Obeid and Nyala |
|
Additional comments | In addition 31 Livestock railway wagons, 62 Gondola type railway wagons. |
Key Route Information
Standard Route Information |
|
|
Port Sudan to Nyala (Nyala is a gateway for distribution throughout the Darfur states and transit through to Chad) |
Track gauge |
1067 mm (3’6”) |
Ruling gradient |
0.6% max 1% |
Total track distance (single and/or double) |
2105 km (single) |
Type of rail (weight and if welded or not) |
90 Ib / yard & 75 Ib/yard not welded, 50 Ib/yard |
Type of sleeper and fastenings |
Concrete and wood, steel about 150 km from El Dein to Nyala pandorol elastic & other used |
Total track travel time |
64 hours when optimum operational conditions. |
Maintenance (Good, marginal, bad) |
Marginal |
Companies-consortiums operating on line |
Albazim for Express Cargo and SAR Railway Services |
Traffic frequency (monthly/weekly/daily) |
No scheduled service – intermittent. |
Security (Good, marginal, bad) |
Marginal – Reliant on clearance from NIS and MI, from Babnosa to Nyala under Security arrangements. |
Main stations (Add details below) |
n/a |
Key Stations
Key Station Information |
|||
|
Kosti |
El Obeid |
Khartoum |
Location |
1,435km to Juba by Nile River Barge |
1,034km from Port Sudan to El Obeid |
787km track distance Port Sudan - Khartoum |
Contact Information |
n/a |
n/a |
n/a |
Connections with other transport means (road/waterways/air) |
Waterway |
Road, Air |
Road, Air |
Storage Capacity (square meters and cubic meters) |
1,000 mt break bulk and 1,500 open space for containers |
36,000 mt |
9,900 mt |
Handling Equipment |
Mobile cranes and forklifts |
Mobile cranes and forklifts |
Mobile cranes and forklifts |
Handling Capacity: MT / Hour TEU / Hour |
n/a |
n/a |
n/a |
Other Comments |
Transit option to South Sudan. |
Primary logistics hub in Sudan. |
Industrial sector in Khartoum and Omdurman area |
2.5 Sudan Waterways Assessment
Company
Information
NRTC, SRTC, Keer Marine, Shankien, Nile Barges are the main water transport companies that were operating through Khartoum – Kosti.
Company | Capacity |
---|---|
NRTC | 17 pusher, 115 barges 400 mt each, 1 flat deck 400 mt each |
SRTC | 10 pusher, 15 barges 400 mt each, 1 flat deck 900 mt |
Keer Marine | 3 pusher, 15 barges 400 mt each |
Shankien | 4 pusher, 9 barges 400 mt each |
Nile Barge | 1 pusher, 2 barges 400 mt each |
All the above companies have pusher and barges in South Sudan (NRTC 6 pusher, 32 barges; SRTC 1 pusher, 5 barges; Nile Barge 2 pusher, 9 barges; Keer Marine 1 pusher, 6 pusher; Shankien 1 pusher, 2 barges).
Other water transport companies that flow on the same line:
Water transport company | Capacity |
---|---|
Abd Elwahab Abd Elrahman Works | 2 pusher, 2 barges |
Anies Gorge Hajaar | 2 pusher, 2 barges |
Tayseer Abu Sinaina & Al Asyouty Works | 2 pusher, 2 barges |
Al Salma for Trading & Investment Co. | 2 pusher, 6 barges |
Al Istidama Agricultural Co. | 1 pusher, 2 barges |
Tristar Anrigy Co. | 1 pusher, 2 barges |
Al Sati River Transport Co. | 3 pusher, 4 barges |
Nile Barges Co. | 3 pusher, 10 barges |
Al Mushier Transport Co. | 1 pusher |
Wadi El Nile River Transport Co | 4 pusher, 16 barges |
Egyptian National Service | 26 barges |
Travel Time Matrix
Travel Time from main port to other major ports (km) |
|||||
---|---|---|---|---|---|
Main port |
Kosti |
Renk |
Malakal |
Bor |
Juba |
Main port |
Kosti |
466 |
501 |
1316 |
1436 |
Renk |
466 |
Renk (South) |
501 |
835 |
970 |
Malakal |
501 |
230 |
Malakal (South) |
650 |
935 |
Bor |
1316 |
835 |
650 |
Bor (South) |
120 |
Juba |
1436 |
970 |
935 |
120 |
Juba (South) |
Key Routes
Key Route Information Domestic / International |
|
---|---|
From: Wadi Halfa, Republic of Sudan To: Oswan (Elsad Al Aali lake), Egypt |
|
Total Distance (km) | 360 kilometres (60 km till El Nuba lake/Republic of Sudan & 300 km inside Egypt till Nasir Lake) |
Season Effects |
none |
Maximum Weight and Size of Vessels |
53,669 mt / 56,420 passengers (in 2013) |
Regular Traffic Passenger / Cargo |
15,000 mt of imported and exported cargo & 26,885 passengers (in 2014) |
Border crossings/customs (name of location) |
Wadi Halfa/Oswan |
Security |
None |
Main Ports |
Wadi Halfa |
North River Nile waterway:
Through Halfa – Akasha – Dongola that covers total distance of 439 kilometres with sailing problems at Dal water dam area.
Suggested/planned waterways: -
A/ Barbar – Khartoum – Kosti:
Last technical study was done in 2006 by Sea Ports Water
Corporation with total distance of 680 kilometres from Barbar to
Kosti. The main sailing problems are represented by the rocks at
five sites in Sabaloga area, north Khartoum as well as islands and
moving sands that seasonally block the line.
B/ El Rosaires – Ethiopia Waterway:
Under study stage with total distance of 576
kilometres.
Port Information
Key Port Information | |
---|---|
Kosti | |
Location | Kosti |
Total Distance (km) |
1,432 km |
Connections with other transport means (road/waterways/air) |
The inland port of Kosti is connected to Khartoum, Port Sudan and El Obeid by rail and road . |
River flow (m3/second) |
924m3 average |
Seasonal effects | Nile seaweeds, El Zilait rocks, Kondukro rocks, river zigzag ways from Kosti to Juba, and October – April dry season. |
Total Travel Time |
Indicative travel time 30/35 days for cargo and 10 days for passengers. Transit times are subject to the prevailing security and border situations |
Maximum weight and size of vessels |
48,400 mt of cargo & 22,000 passengers (last operations in 2010) |
Regular traffic (passenger/cargo) | 262 vessels |
If yes, with what company? | SRTC, NRTC, Shankien, Nile Barges, Keer Marine |
Security (marginal/good/bad) | Marginal, the line is currently non-functioning due to the political and security situation in South Sudan |
Border crossings/customs (name of location) |
The Border crossing between the Republic of Sudan and Republic of South Sudan have restricted traffic movements, pending the finalisation of border formalities. |
Connection with other means of transport (road/railways/air).
The Inland Port of Kosti is connected by Rail and Road from Khartoum, Port Sudan and El Obeid
2.6 Sudan Storage Assessment
There are different types and condition of warehouses and
storage available throughout the Republic of
Sudan. The construction of Western
Sudan asphalt road up to El Fasher improved the storage
and logistic capacities in the area especially in El Geneina town
in Western Darfur.
A limited number of warehouses have raised-siding or are served directly by rail; the majority of warehouses have fixed working areas with no platforms that would assist in receiving and dispatching cargoes.
UN Agencies, INGOs and SRC (Sudanese Red Cross) have storage facilities while commercial entities have different structures, varying from small warehouses to large fabricated warehouses for specific cargoes.
Cold Chain facilities are limited.
Bulk silos are situated within the Mills of SAYGA, in Khartoum North and in the port area of Port Sudan.
Commercial Storage
Location |
Owner |
Available for Rent |
Capacity (Mt/m²/ m³) |
Type |
Access |
Condition |
Khartoum Airport |
MAKS Air |
No |
1000 m2 |
Brick – Zinc |
From Secure Apron and exit to Africa Road |
Good |
Storage Used by Humanitarian Organizations
Storage and other services on behalf of other partners and/or humanitarian organizations will be processed on a cost recovery basis.
Location |
Organisation |
Sharing possibility |
Capacity (mt / m² / m³) |
Type |
Access |
Condition |
El Obeid (Airport) |
WFP |
No |
12,000 Mt |
31 Flospan, 2 MSUs, I MSU hanger |
By road. The facility has an access direct to El Obeid airport apron, used in the past to load aircraft for airdrops. |
Good |
El Obied (ABS site) |
WFP |
No |
14,000 |
4 x Permanent, 30 |
Access by Road |
Good |
EL Obeid |
WFP |
No |
14,000 Mt |
30 MSUs |
Access by Road |
Good |
Port Sudan ‘Hadan' |
WFP |
No |
7,500 Mt |
1 Permanent |
Access by Road |
Good |
Port Sudan ‘Flamingo' |
WFP |
No |
45,000 Mt |
3 Permanent |
Access by Road |
Good |
Dama Dama |
WFP, through Port Sudan Port Authorities |
No |
7,500 Mt, used for stripping inward containers and storing contents pending final clearances. |
Permanent |
Access by Road, within the Port secured facility – South Port |
Good |
Nyala ‘Otash' |
WFP |
Yes |
33,000 Mt |
MSUs and Flospan |
Access from Main Road |
Good |
Khartoum |
WFP |
No |
9,900 Mt |
2 MSUs and Permanent |
Access from Main Road |
Good |
Zalengi |
WFP |
No |
5,400 Mt |
12 MSUs |
Access from Main Road |
Good |
Gereida |
WFP |
No |
6,300 Mt |
16 MSUs |
Access from Main Road |
|
El Fasher |
WFP |
No |
26,775 Mt |
1 Permanent 42 MSUs |
Access from Main Road |
Good |
Nyala |
EF-NFI within WFP |
Yes |
1600 m2 |
5 Msu |
Road |
Good |
El Geneina |
EF-NFI within WFP |
Yes |
24,000 MT |
5 Msu |
Road |
Good |
El Fasher |
EF-NFI |
Yes |
16O7m2 |
7 Msu |
Road |
Good |
El Obeid |
EF-NFI |
Yes |
3023m2 |
2 Permanent |
Road |
Good |
Kassala |
WFP |
No |
2,400 Mt |
1 Permanent |
Road |
Good |
Rabak |
WFP |
No |
450 Mt |
4, 1 MSU |
Road |
Good |
Ed Daein |
WFP |
Yes |
|
5 Permanent, 11 MSUs |
Road |
Good |
Kass |
WFP |
No |
2,250 Mt |
5 MSUs |
Road |
Good |
Muhajeria |
WFP |
No |
900 Mt |
2 MSUs |
Road |
Good |
Joghana |
WFP |
No |
450 tons |
1 MSUs |
Road |
Good |
Kabkabya |
WFP |
No |
5,250 Mt |
12 MSUs |
Road |
Good |
Umshalaya |
WFP |
No |
450 Mt |
1 MSU |
Road |
Good |
Umtajock |
WFP |
No |
450 Tons |
4 MSUs |
Road |
Good |
Habila |
WFP |
No |
9,000 Mt |
20 MSUs |
Road |
Good |
Mukjar |
WFP |
No |
8,100 Mt |
18 MSUs |
Road |
Good |
Dammazine |
WFP |
No |
700 Mt |
1 Permanent |
Road |
Good |
Challe |
WFP |
No |
900 Mt |
2 MSUs |
Road |
Damaged |
Kurmuk |
WFP |
No |
900 Mt |
2 MSUs |
Road |
Damaged |
Kadugli |
WFP |
No |
1,600 Mt |
4 MSUs |
Road |
Goo |
Kauda |
WFP |
No |
1,350 Mt |
3 MSUs |
Road |
Goo |
Abugebeha |
WFP |
No |
1,800 Mt |
4 MSUs |
Road |
Goo |
Talodi |
WFP |
No |
1,200 Mt |
4 MSUs |
Road |
Goo |
Public Sector Storage
Location |
Ministry / Agency |
Use Possibility |
Capacity (mt / m² / m³) |
Type |
Access |
Condition |
Port Sudan South Port |
Ministry of Transport |
Yes |
6000 m2 LCL traffic |
Brick – Zinc |
Through Southern Port gates |
Good |
Port Sudan South Port |
Ministry of Transport |
Yes |
57,000 m2 |
Brick – Zinc |
Back of North Port Terminal |
Good |
Red Sea Free Zone |
Government of Sudan |
Yes |
600,000 m2 |
Open area |
38 km south of Port Sudan |
Under construction |
Khartoum Airport |
Dept of Civil Aviation |
No |
3000 m2 |
Zinc – Brick |
Within the secured area of airport |
|
Cold Chain
Cold chain facilities in the Republic of Sudan are limited, no in depth survey was carried by the LCA regarding the Cold Chain.
Port Sudan has Reefer connections for Reefer containers landed for onward forwarding, in 2012, 300 reefer units were handled through Port Sudan.
Location |
Organisation/Owner |
Type |
Cooling / Power |
Quantity |
Total Capacity (m³) |
Condition |
Khartoum International Airport |
Civil Aviation- Khartoum International Airport |
2 x Cold Rooms negative |
Compression |
30 Tons |
120 |
Did not survey |
2.7 Sudan Milling Assessment
Milling Company - Sayga international
Sayga is Sudan’s primary food company. In 1996, Sayga Flour Mills began producing Sayga bakery flour. This wheat-based flour is produced by Swiss machinery with fully automated production lines for flour, semolina and bran to meet the various requirements of both the retail and industrial food sectors.
Sayga Investments has silos in the Port area with a capacity 170,000 mt, situated within 2 km of the berth. The method is to discharge bulk is with grabs or evacuators to hoppers, load it to 16 allocated dump-bulk road trucks and then transport for 2Km to the silos, delivering through the bulk intake. The daily rate is up to 12,000 metric tons per WWD using ship’s gear with four gangs. The facility has bagging lines, with an under covered loading area. The daily bagging rate basis for 16 working hours is around 2000 mt.
Rail facilities for the receipt and dispatch of bulk and bagged agricultural products are located within the structure. Sayga Company has full capacity to store, fumigate, and transport downstream.
Facilities |
||||
Parking area inside compound |
|
m² |
||
Drainage |
||||
Fire Fighting Equipment |
Yes |
Updated and surveyed. |
||
Number of Ventilators |
||||
Electricity Load (KVA) |
|
|||
Backup Generator |
Conditions and Cleanliness |
||
|
Outside |
Inside |
Cracks in walls or roof |
No |
No |
Signs of rodent activity |
No |
No |
Signs of birds entry |
No |
No |
Damaged gutters/drains |
No |
No |
Signs of moisture |
No |
No |
Adjacent Vegetation |
None |
No |
Cleanliness |
Good |
Good |
Security |
||
Security |
Good |
Good CCTV cameras and controlled access for staff and operational vehicles. |
Compound |
Fenced |
|
Access |
||||||
Distance from main town |
Khartoum |
10 km |
||||
Travel time if not located in town |
30 – 45 Minutes |
|
||||
Road condition to Mill |
Good, although often congested as it is located in an industrial area. |
|
||||
Road limitation (if any) |
Width (m) |
|
Max. Tonnage |
|
||
Rail connections |
Siding into the Mill |
Yes |
||||
On the railway from |
Port Sudan |
To |
End of Line |
|||
Sayga operates its own trains with bulk railway wagons directly from their silos situated in Port Sudan |
Transport Capacity at Mill |
Capacity to receive Bulk on rail, and Bagged by Road. Capacity to dispatch bagged product by road, and bulk milled product using “Bulk’ road vehicles. |