“I am more than happy to provide this recommendation for Andrew Wai. In the world of mining, work comes and goes so unexpectantly that it can sometimes be difficult to keep good people around. I have worked with Andrew for eighteen (18) months in a superintendent role for Engineering and Reliability for mining operational fixed plant. I have found Andrew to be technically proficient both as an engineer and a reliability specialist. His ability to provide coaching and mentoring to junior engineers and peers is a natural asset for him. He can be more than he is and be a positive and proactive campaigner and leader for his chosen profession in Papua New Guinea or anywhere he chooses. Please feel free to contact me for any further information. Sincerely, Michael Kosef Project Engineer – Reliability Nestle Purina michael.kosef@au.nestle.com michael.kosef@gmail.com” ”
About
Experienced Reliability, Asset Management & Maintenance practitioner with a strong…
Activity
-
Comlek E&I shutdown maintenance team two. Newmont Lihir Island, March - April 2024
Comlek E&I shutdown maintenance team two. Newmont Lihir Island, March - April 2024
Liked by Andrew Wai
-
The taste of home. Nothing feels better on my first day of R&R with a cup of Kongo Coffee in the chilling morning of Kelmscott, Western Australia.
The taste of home. Nothing feels better on my first day of R&R with a cup of Kongo Coffee in the chilling morning of Kelmscott, Western Australia.
Liked by Andrew Wai
Experience
Education
Volunteer Experience
-
Maths Tutor
Telikom Training College Math Club
-
President
Star Mountain Eagles Rugby League Club
-
President
Lae Community Association of Tabubil
-
Member
NATTB
Licenses & Certifications
-
InfraRed Thermographer: Level 2
Infraspection Institute
-
Form 23 Certificate of Competency for Mine Manager - Works
Independent State of Papua New Guinea Mining (Safety) Act 1977 Mining (Safety) Regulation 1935
-
AICIP Certified In-Service Inspector: Pressure Equipment
Australian Institute for the Certification of Inspection Personnel (AICIP)
-
Basic First Aid
St. John Ambulance Papua New Guinea
-
Liquid Penetrant ISO 9712 Level 2
ATTAR (Advanced Technology Testing and Research)
-
Rapid Motion Scanner System
SilverWing UK Ltd
-
Ultrasonics ISO 9712 Level 2
ATTAR
Courses
-
API 653 Authorised Tank Inspector
WTS 61040146
-
AWS Centre of Excellence – In-Service Inspection of Pressure Equipment
-
-
Alstom MSc – Machinery Health Manager Database Building
-
-
Rapid Motion Scanner System
-
-
St. John Ambulance – Basic First Aid
-
-
ARMS Reliability – Apollo Root Cause Analysis
-
-
Beasley’s – Basic Hydraulics
-
-
CBC Motion – Bearing Selection and Safe Practices
-
-
Shell Lubricants – Lubrication Management
-
-
Weir Minerals Australia – WMA06 Slurry Pump Selection
-
Projects
-
OTML Classified Plant Management Project
- Present
Goals:
1. Ensure all Classified Plant site-wide have an encompassing system of management to manage the risks associated
2. Eliminate failures related to the incorrect use and handling of Classified Plant
3. Improve Life Cycle Engineering Practices and Strategies that ensure Industrial and Regulator Standard Requirements
Milestones
* Develop and approve a Classified Plant Management Standard
* Ensure all Classified Plant Equipment and their Maintenance Strategies are in…Goals:
1. Ensure all Classified Plant site-wide have an encompassing system of management to manage the risks associated
2. Eliminate failures related to the incorrect use and handling of Classified Plant
3. Improve Life Cycle Engineering Practices and Strategies that ensure Industrial and Regulator Standard Requirements
Milestones
* Develop and approve a Classified Plant Management Standard
* Ensure all Classified Plant Equipment and their Maintenance Strategies are in the Computerized Maintenance Management System i. e. SAP
* Develop and roll out Classified Plant Awareness and Training
* Define and justify improved operational and storage facilitiesOther creators -
OTML Hydrocarbon Management Project
- Present
Goals:
1. Eliminate failures related to inadequate lubrication, and system contamination
2. Reduce annual hydrocarbon expenditure per operating hour
Milestones
* Develop and approve Hydrocarbon Management Standard
* Develop and roll out Hydrocarbon Management Training
* Define and justify improved storage and handling facilities
* Retrofit lubricated compartment for effective contamination control
* Set up onsite Oil Lab to determine ISO cleanliness levels
Other creators -
Liner Yard Upgrade Project
-
Goals:
1. To eliminate the delays and mistakes made when looking for the correct liners during shutdowns and shutdown preps
2. Optimize Inventory costs for these consumables in terms of usage, storage and transportation
Milestones:
* Design layout that will effectively map the area of storage for different Liners and liaise with supply team to ensure end users are content with design
* Remove old/unused buildings and re-sheet area with aggregate
* Draw up proper and…Goals:
1. To eliminate the delays and mistakes made when looking for the correct liners during shutdowns and shutdown preps
2. Optimize Inventory costs for these consumables in terms of usage, storage and transportation
Milestones:
* Design layout that will effectively map the area of storage for different Liners and liaise with supply team to ensure end users are content with design
* Remove old/unused buildings and re-sheet area with aggregate
* Draw up proper and correct signs for individual liners
* GPS mark the area where Liners will be installed, install signs and mark out respective Liners areas
* Order Liners in correct locations
* Review Supply Chain for Liners to ensure FIFO for each Liner Type between Casting, Transit and StockOther creators -
Annual Safety Improvement Project
In 2014, as part of the Reliability Services Section target of each individual team member contributing one new safety improvement project per year, I achieved mine through the conceptualization, design, planning and execution of Handrails for concrete footing into/out of the flotation bund.
-
Fixed Plant Oil Analysis Management - Barrick Porgera
-
There are five stages in this project:
1. Identifying the equipments' need for oil analysis
2. Creating SOP and identifying analysis parameters
3. Setting up analysis parameters in conjunction with Shell
4. Implementing SOP and Reviewing Parameters
5. Continuous Review.
At this point in time, we are currently in 3rd and 4th stages of this project. Its ongoing and continuously improving.Other creators -
Emergency Relocation of Tailings Pipeline
In 2013, the Tailings Discharge Pipeline at Barrick Gold’s Porgera Gold Mine was being pulled and torn apart by an eroding mass of earth that was part of the haul road to the erodible dumpsite. This would have shut the mine down for an indefinite period of time. I was part of the team tasked with running 2 new 600 mm poly-pipe (HDPE) line for approximately 2 km without having to shut the plant down. This work encompassed design of new system (flows, settling velocities etc), welding of…
In 2013, the Tailings Discharge Pipeline at Barrick Gold’s Porgera Gold Mine was being pulled and torn apart by an eroding mass of earth that was part of the haul road to the erodible dumpsite. This would have shut the mine down for an indefinite period of time. I was part of the team tasked with running 2 new 600 mm poly-pipe (HDPE) line for approximately 2 km without having to shut the plant down. This work encompassed design of new system (flows, settling velocities etc), welding of poly-pipe, transporting of the pipes with cranes and forklifts, digging of trenches with appropriate slopes, laying of culverts, aligning of pipes (esp at the elbows) commissioning and running of new lines whilst maintaining the current failing lines in under 10 weeks.
Other creators -
Compiled and Developed Justification for positive displacement GEHO Pump $1.5M Upgrade for Autoclave Feed for increased Plant Reliability and Production
Also in 2013, I was tasked with compiling a cost justification for the purchase of 2 new 600ZPM Series GEHO Positive Displacement Slurry Pumps for Pressure Oxidation Circuit (Autoclave) Feed. I compiled a comprehensive Report that was used to support an AFE from information that spanned back 15 years at most. This data came from analyzing maintenance history, service history (i. e. tonnes produced), costs incurred and also included projected production figures and savings (de-risking…
Also in 2013, I was tasked with compiling a cost justification for the purchase of 2 new 600ZPM Series GEHO Positive Displacement Slurry Pumps for Pressure Oxidation Circuit (Autoclave) Feed. I compiled a comprehensive Report that was used to support an AFE from information that spanned back 15 years at most. This data came from analyzing maintenance history, service history (i. e. tonnes produced), costs incurred and also included projected production figures and savings (de-risking opportunities).
-
Developed ANAWE Mill Downtime Database Analysis Template and initiated use for improved Plant Reliability
In 2012, my colleague Albert Warkia and I developed Anawe Mill Downtime Database Analysis template to identify areas in dire need of improvement and for ongoing monitoring and continuous improvement. The results of its successful implementation have been documented by Barrick Gold’s Asset Management Division and Barrick’s Porgera Gold Mine.
Other creators
Organizations
-
SMRP
CMRP
-
AINDT
Member
-
Institute of Engineers Papua New Guinea Inc (IEPNG)
Member
-
Australian Institute for the Certification of Inspection Personnel (AICIP)
In-Service Inspector
-
The Australasian Institute of Mining & Minerals (AusIMM)
Member - MAusIMM
Recommendations received
8 people have recommended Andrew Join now to view
More activity by Andrew
We are happy to announce that we have joined as a Gold Sponsor for the 2024 Geoscience, Exploration & Extraction (GEE) Conference and Exhibition…
Liked by Andrew Wai
People also viewed
Explore collaborative articles
We’re unlocking community knowledge in a new way. Experts add insights directly into each article, started with the help of AI.
Explore More