Romelectro Presentation
discover the business power
44 years at a Glance (1)
1971
Romelectro is set up as the foreign trade
company of the Ministry of Energy
1974-1978 First export works for dams and OHTLs in
Iran and Algeria
1980
Complex T&D contracts in Egypt, Iraq,
Jordan, Lebanon, Malaysia
1982–1984 Turnkey works of Vafregan Dam in Iran
discover the business power
1990
Power T&D works in the Philippines and
Thailand
1993
Romelectro is present in 19 countries
1994
Romelectro becomes a 100% private
company
2004
Starting of the turnkey execution works for
the Complex Hydro-development of Jiu
Canyon, Bumbe ti–Livezeni Stretch
44 years at a Glance (2)
2005
Romelectro becomes major shareholder in
ISPE, CELPI and Electromontaj Carpaţi
Sibiu, setting up Romelectro Group
2008
Romelectro becomes investor of Ecogen
Energy Buzau and starts the Construction
of a Combined Heat and Power Plant in
Buzău
2009
Romelectro becomes investor of Voineasa
Micro Hydro Power Plant
2007-2014 Romelectro develops environmental
protection competencies (low Nox burners,
Dense Slurry Systems, Flue Gas
Desulphurisation)
discover the business power
2010
Romelectro becomens investor by
ECOGEN Buzau, by insalling and
commissionin of new cogeneration plant.
2010
Romelectro signed the contract for Bradu
400/220/110/20 kV substation Refurbishing
2015
Romelectro signed the contract for
Stejaru HPP Refurbishment
Romelectro Group structure
EPC Contractor, Project Developer
and Investor in the fields of power and
heat generation, power transmission
& distribution, environmental
protection and industry
New entity with
Romanian and Saudi
Shareholders, acting
as EPC Contractor
and Project
Developer in Arab
Countries
Leader as consulting
and engineering
company in the field of
power generation,
power T&D,
environmental
protection and industry
Contractor for
design, construction
and testing for steel
structures in the field
of power T&D and
telecommunication.
Contractor for
construction and
installation works
for power
Transmission and
Distribution
projects.
About Romelectro
MARKET AREAS
Power
Generation Thermal
Power
Generation Hydro
Roles on the market
•
•
•
•
•
EPC Contractor
Investor
Project Developer
Strategic Partner
Electricity trader
Power
Transmission
and
Distribution
Environmental
Protection
Industry
About Romelectro
Romelectro offer
• Turn-key contracting
• Studies, research and development
• Technical consultancy
• Commercial and institutional consultancy
• FEED, Basic and detailed engineering
• Equipment supplier
• Installation and assembling services
• Civil works
• Site supervision and project management
• Commissioning
• Rehabilitation and modernisation programs
Power
Generation
Hydro
Power
Trasmisson &
Distrbution
Environmental
Protection
Industry
Power Generation - Thermal
As Romelectro’s expertise over the years extends to most of the heat and power plants in
Romania, we have the necessary competences, technologies, resources and know-how
to answer to our clients’ needs for both green field projects and existing power plants.
As investor and project developer, Romelectro transformed the existing power plant of
Buzău into a modern Combined Heat and Power Plant, using high efficiency technology.
References:
• Complex rehabilitation, retrofitting and upgrading programs in the field of thermal power
plants and cogeneration plants developed for more than 3,000 MW.
• Engineering and design for more than 15,000 MW in conventional & nuclear power
plants, representing 90% of the total installed capacity of Romania.
• Projects for new facilities using both conventional fuels and renewable energy sources
(biomass, biofuel, waste).
Power
Generation
Thermal
Power
Trasmisson &
Distrbution
Environmental
Protection
Industry
Power
Generation
Power
Generation- Hydro
- Hydro
• As EPC Contractor, Romelectro is leading the complex development of the Jiu River on
Bumbeşti–Livezeni stretch and the construction of two hydropower plants with an
installed power of more than 60 MW.
• As investor and general contractor, Romelectro developed 3 Micro Hydro Power Plants
on Mănăileasa River with an installed power of 1.45 MW.
• Romelectro carried out the feasibility studies for the Ramdane Djamel and Zaouia
Dams (Algeria); detailed technical design for the Bougous and Bouhalloufa Dams
(Algeria); turnkey execution of the Vafreghan Dam (Iran); execution of the El – Fakia
(Algeria) and turnkey heightening of the Ksob Dam (Algeria).
•Recently Romelectro signed for the rehabilitation of Stejaru HPP 210 MW.
Power
Generation
Thermal
Power
Generation
Hydro
Environmental
Protection
Industry
Power Transmission & Distribution
Romelectro’s capabilities in the Power Transmission and Distribution field have been
proved through the 45 years long hystory of domestic and international projects:
• Engineering for more than 22,000 km of OHTLs in Romania and about 10,000 km OHTLs
(750 kV, 400 kV, 220 kV, 110 kV) km in countries like Iran, Iraq, Philippines, Jordan, Syria,
Algeria or Malaysia
• Design, engineering, construction for more than 150 high voltage substations
• Grid connection studies for more than 30,000 MW of wind energy farms
• Strategies and forecasting studies for the National Power System
Power
Generation
Thermal
Power
Generation
Hydro
Power
Trasmisson &
Distrbution
Industry
Environmental Protection
In line with the environmental protection related goals set by the EU Energy 2020
Strategy and the EU Energy 2050 Roadmap, Romelectro promotes and implements the
most advanced tehnologies:
• Ash and slag removal and storage in dense slurry system: projects for 12 coal-fired
boilers at Oltenia Energy Complex.
• Flue gas desulphurization at I alni a TPP.
• NOx emission reduction: projects for 14 gas-fired boilers at Gala i CHPP, Iernut TPP,
Progresu CHPP, Bucure ti Vest CHPP and Bucure ti Sud CHPP.
Power
Generation
Thermal
Power
Generation Hydro
Power
Trasmisson &
Distrbution
Environmental
Protection
Industry
Energy efficiency in Industry
Romelectro takes over the whole chain from technical general audit to implementation,
going through: Technical audit (thermal, electrical, utilities), Projects technical-economic
analysis – opportunity, prefeasibility and feasibility studies, cost – benefit analysis, Business
plan, Identifying financing/co-financing sources for investment, financial model, social,
economic and environmental impact assessment, turn-key contracts.
We cover all energetic issuesFactory energy dispatcher
• Energy management system
• New power generation resources
• Specific thermal, mechanical and electrical solutions
• Electrical distribution system SCADA systems (electric/thermal power, water, natural
gas, heavy fuel oil etc)
• DCS or PLC systems for process management
• Process simulation systems
• Security systems, Video - data - voice networks
PROJECTS
V
Ișalnița TPP - Flue gas desulphurisation system
PROJECTS > THERMAL POWER > ENVIRONMENTAL PROTECTION
Scope of the project: reducing the sulphur dioxide
(SO₂) emissions, discharged together with the flue
gas resulting from power units no. 7 and no. 8 at
I alniţa TPP – SE Craiova – Oltenia Energy
Complex.
FACTS AND FIGURES
•2 x 315 MW power units
• 3317 ÷ 5543 mg/Nm³ rated sulphur
dioxide emission, estimated in the
current operation
The two plants are being executed identically, with
the same type of equipment, delivered by the same
suppliers.
• 200 mg/Nm³ maximum SO₂
concentration after project
implementation
Starting year: 2012
Commissioning year: 2014
Client: Oltenia Energy Complex – SE Craiova
• Wet desulphurization plant using
limestone slurry
Babcock Noell GmbH – Consortium Leader
Romelectro – Consortium Partner
Ispe – Engineering
• 96% desulphurization efficiency
Turceni
TPP System
- DenseatSlurry
System
Dense Slurry
Turceni
TPP
PROJECTS > THERMAL POWER > ENVIRONMENTAL PROTECTION
Turceni TPP is the largest coal fired producer, supplying
more than 10% of the energy consumed in Romania.
FACTS AND FIGURES
Scope of the project: Solutions for discharge, transport and
storage of the waste resulting from the coal firing process at
Turceni TPP, using dense slurry technology. The new
investment consists mainly of:
• 4 × 155 t/h of dry solids
(30 t/h bottom ash + 105 t/h fly
ash
+ 20 t/h FGD gypsum)
•
•
•
•
•
• 5 × 450 kW + 1 × 250 kW
Atlascopco compressors
two dense slurry preparation stations
bagger pumps replacement
dry ash transport installation
air compressor station
one wastewater treatment plant
• 4 × 330 MW units
• 8 sets of Metso Mineral
centrifugal pump grups
Starting year: 2009
Commissioning year: 2012
Client: Turceni TPP
• CIRCUMIX continuous mixing
technology
Romelectro: EPC Contractor
• 4900 m transport distance
• 24 m geodetic level difference.
Craiova
II CHPP
- Dense
Slurry
Dense Slurry
System
at Craiova
II System
CHPP
PROJECTS > THERMAL POWER > ENVIRONMENTAL PROTECTION
FACTS AND FIGURES
Part of Oltenia Energy Complex, Craiova II CHPP
(2 × 150 MW) has a significant importance both for the
Romanian power sector and for the city of Craiova, being the
only heat producer both for population and strategic industrial
consumers such as Ford automotive factory and other plants
on the industrial platform.
Scope of the project: Increasing the stability of the Valea
Mănăstirii slag and ash deposit by executing the installations
for ash and slag dense fluid and by developing the storage
for the first hightening.
Starting year: 2008
Commissioning year: 2010
Client: Craiova II CHPP
Romelectro: EPC Contractor
• 2 × 150 MW power units (+8
district heating boilers)
• 2 × 86 t/h of dry solids
• (6 t/h bottom ash + 60 t/h fly ash +
20 t/h dry gypsum)
• 1:1 water to solid ratio
• CIRCUMIX continuous mixing
technology
• 2 × 140 m3/h + 1 × 110 m3/h
transport slurry lines
• 3 sets of Feluwa hose diaphragm
slurry pumps for distance transport
• 9400 m transport distance
• 90 m geodetic level difference
Ișalnița TPP - Dense Slurry System
PROJECTS > THERMAL POWER > ENVIRONMENTAL PROTECTION
Part of Oltenia Energy Complex, Ișalnița TPP
(2 × 315 MW) has a significant importance for the
Romanian power sector being one of the largest power
generation capacities operation in Romania.
Scope of the project: Increasing the stability of the slag and
ash storage of SE I alni a, on the right and left banks of Jiu
river, using dense fluid technology. The solution is designed to
transform the existing heavily polluting ash handling system to
match the eco-friendly dense slurry technology.
Starting year: 2008
Commissioning year: 2010
Client: I alni a TPP
Romelectro: EPC Contractor
FACTS AND FIGURES
• 2 × 315 MW power units, 4 ×
510 t/h boilers
• 4 × 77 t/h of dry solids (5 t/h
bottom ash + 52 t/h fly ash + 20
t/h dry gypsum)
• CIRCUMIX continuous mixing
technology
• 3 × 120 m3/h transport slurry
lines – 1 ash field
• 4 sets of Warman centrifugal
pump groups
• 3 pumps/group for distance
transport
• 4600 m transport distance
• 45 m geodetic level difference.
Rovinari TPP - Dense Slurry System
PROJECTS > THERMAL POWER > ENVIRONMENTAL PROTECTION
FACTS AND FIGURES
The second largest coal fired producer in Romania, with an
installed power of 1320 MW (4 x 330 MW), Rovinari TPP
supplies about 9% of the total electricity generated on the
local market.
Scope of the project: New ash and slag deposit in Gârla and
new installations for collecting, preparation, discharge and
storage of dense slurry in Rovinari TPP (4 x 330 MW)
• 4 x 330 MW units
• 4 x 190 t/h at dry solids (30 t/h fly
bottom ash + 127 t/h fly ash + 33 t/h
dry gypsum)
• CIRCUMIX continuous mixing
technology
Starting year: 2008
Commissioning year: 2010
Client: Rovinari TPP
• 4 x 270 m3/h transport slurry lines
Romelectro: EPC Contractor
• 4 sets of Warman centrifugal pump
groups
• 7000 m transport distance
• 32 m geodetic level difference.
Galați CHPP Low NOx (1)
PROJECTS
> THERMAL POWER
> ENVIRONMENTAL PROTECTION
PROJECTS › ENVIRONMENTAL
PROTECTION
Scope of the project: : Modernization and retrofitting of firing
systems of 4 x 420 t/h boilers at Galati CHPP, by implementation
of low NOx burners and automatic BMS and DCS.
FACTS AND FIGURES
For each of the C6, C7 and C8 steam boilers , the new
installation consists of:
• 6 x 53 MW mixed heavy fuel oil –
natural gas low NOx burners/boiler
body (for C6, C7 and C8)
• 6 low NOx mixed burners for heavy fuel oil and natural gas
• a new modern system for heavy fuel oil and natural gas supply
• a new BMS (Burner Management System) unit
• a new DCS (Distributed Control System) unit
• emission monitoring system
• methane leakage monitoring system
• 4 x 420 t/h steam boilers
• 6 x 53 MW natural gas low NOx
burners/boiler body (for C5)
Galați CHPP Low NOx (2)
PROJECTS
> THERMAL POWER
> ENVIRONMENTAL PROTECTION
PROJECTS › ENVIRONMENTAL
PROTECTION
For C5 steam boiler, the new installation consists of:
• 6 low NOx burners for natural gas
• 8 low NOx burners for blast furnace gas
• a new modern system for natural gas supply
• a new modern system for blast furnace gas supply
• a new BMS (Burner Management System) unit
• a new DCS (Distributed Control System) unit
• emission monitoring system
• methane leakage monitoring system
Starting year: 2008
Commissioning year: 2013
Client: Electrocentrale Gala i
Romelectro: EPC Contractor
FACTS AND FIGURES
• 8 x 21 MW blast furnace gas
low NOx burners /boiler body
• BMS type SIL3, failsafe, double
redundant /boiler body
• DCS type Ovation /boiler body
Iernut TPP - Low NOx
PROJECTS > THERMAL POWER > ENVIRONMENTAL PROTECTION
FACTS AND FIGURES
Scope of the project: modernization and retrofitting of firing
systems of 4 x 320 t/h natural gas fired boilers at Iernut TPP,
by implementation of low NOx burners and automatic BMS.
For each boiler, the new installation consists of:
• 10 low NOx burners
• a new modern system for natural gas supply
• a new BMS (Burner Management System) unit
• upgrading and extension of existing DCS for integration of
new BMS
• emission monitoring system
• methane leakage monitoring system
Starting year: 2009
Commissioning year: 2011
Client: ELCEN Bucure ti
Romelectro: EPC Contractor
• 2 x 215 MW units
• 2 x 640 t/h (4 x 320 t/h) steam
boilers type PK-47-2
• 10 x 30 MW low NOx burners /
boiler body
• BMS type SIL3, failsafe, triple
redundant / boiler body
Govora CHPP - Electrostatic precipitators modernization
PROJECTS > THERMAL POWER > ENVIRONMENTAL PROTECTION
Govora CHPP is the only thermal energy producer
for Râmnicu-Vâlcea area in Romania. It is also the
only steam supplier for Râmnicu Vâlcea industrial
platform and it can deliver power to the national
power grid.
Scope of the project: Modernization of the
electrostatic precipitators for boilers no. 5 and no.
6 at Govora CHPP, aiming to reduce the level of
dust emissions at maximum 48 mg/Nm3 at ESP’s
outlet.
Starting year: 2012
Commissioning year: 2013
Client: Govora CHPP
Romelectro – EPC Contractor
Techno Montaj – Mechanical erection
Icpet Eco – Engineering and design
FACTS AND FIGURES
• 2 x 420 t/h steam boilers
• 4 ESP casings are to be fitted with
new inner instalation components
• 400 mm collecting electrodes
spacing optimised design
• 24 new high-performance 120 kW
power transformers with highfrequency technology to supply high
voltage to the retrofitted ESP’s
• 2 new improved ESP monitoring
and control systems
•48 mg/Nm³ maximum dust
emissions at ESP’s outlet, after
project completion
Rovinari TPP unit 4
Modernization of Electric and Automation Installations
PROJECTS > THERMAL POWER
• The executed works provided an efficient operation of Power Unit No. 4, in safe and
highly reliable conditions. Moreover, the requirements related to the environmental
legislation shall also be achieved in operation.
• Full replacement of the 6 and 0.4 kV substations, the DC substations, rectifiers, inverters,
and 24 and 220 V DC stationary batteries, digital protections for the power unit, static
excitation, substation and IT aggregates for the electrostatic precipitators, DCS –
Distributed Control System, firing control system, measurement loops in the boiler and
machinery halls, Governor control system of the steam turbine and boiler feed pump
turbine.
•ROMELECTRO, acting as Consortium Leader had to identify the best technical solutions
and harmonization of the delivered equipment with the existing or refurbished installations.
Starting year: 2013
Commissioning year: 2014
Client: Complexul Energetic Oltenia – Rovinari TPP Co
PARTNERSHIP
Romelectro – Consortium Leader
SAEM Energomontaj IEA – Consortium Partner
ISPE – Engineering and Design
Buzău
CHPP
Investment
for and
Combined
Heat in
and
Power Plant
Investment
for-Combined
Heat
Power Plant
Buzău
PROJECTS
› CONGENERATION
PROJECTS
> THERMAL POWER
As investor and general contractor, Romelectro
developed the project transforming the existing
power plant of Buzău into a modern combined
heat and power plant, using high efficiency
technology.
The new generation capacity is operated by the
Special Purpose Vehicle (SPV) created on the
basis of private–public joint venture.
FACTS AND FIGURES
• Inhabitants of Buzău City: ~150,000
• Length of primary district heating
system: ~26 km
• Length of secondary district heating
system: ~56 km
• Total number of apartments: ~35,000
Starting year: 2008
Commissioning year: 2009
Client: Ecogen Buzău (IPP)
Romelectro: Investor, EPC Contractor
• Number of apartments supplied:
~21,000
Jiu
Canyon
- Complex Hydro-Development
Complex
Hydro-Development
of Jiu Valley
PROJECTS
› HYDROPOWER
PROJECTS
> HYDROPOWER
As EPC Contractor, Romelectro executes the complex development of the Jiu River
on Bumbești–Livezeni stretch and the construction of two hydropower plants
(Dumitra and Bumbesti) with an installed power of approximately 60 MW and
Livezeni dam. This project represent the most important investment in Romania in
hydropower field after 1990.
Starting year: 2004
Commissioning year: 2013 (Dumitra HPP), 2014 (Bumbe ti HPP)
Client: Hidroelectrica
Romelectro: EPC Contractor, Consortium Leader
Hidroelectrica and ISPH: Consortium Partners
Voineasa
Microof
Hydro
PowerMicro
PlantHydro
Rehabilitation
Rehabilitation
Voineasa
Power Plant
PROJECTS
› HYDROPOWER
PROJECTS
> HYDROPOWER
Romelectro became the owner of the hydro power capacity on Mănăileasa River in
2006.
As investor and EPC Contractor, in 2009 Romelectro started the works for the
complete rehabilitation of Voineasa MHPP, creating a new and efficient capacity for
harvesting the renewable potential of Mănăileasa River.
Scope of the project: developing the 3 Micro Hydro Power Plants on Mănăileasa River
with an installed power of 1.45 MW by replacing the old generation capacities with new
hydro-mechanical and electrical equipment.
Starting year: 2009
Commissioning year: 2011
Romelectro: Investor and EPC Contractor
Stejaru
HPP
Rehabiliation
Complex
Hydro-Development
of Jiu Valley
PROJECTS > HYDROPOWER
Scope of the project: Romelectro is leading for 6 years in a row the turn key project CHE
Stejaru Rehabilitation - Hydropower Romanian School .
Starting year: 2015
Commissioning year: 2021
Romelectro: EPC Contractor
The Hydropower, the central point of the Complex Landscaping of the Bistrita River, with an
installed capacity of 210 MW and over 50 years of functioning, summing up over 1.000.000
working hours, is preparing for the implementing of some state-of-the-art solutions, that will
assure a high level of availability and security for at least the following 30 years.
Client: Hidroelectrica
Romelectro: General Contractor, Consortium Leader
Litostroj Power Slovenia: Consortium Partner
400/110
kV Brașov
Substation
Refurbishment
of the
400/110Refurbishment
kV Brașov Substation
PROJECTS
› POWER
TRANSMISSION
& DISTRIBUTION
PROJECTS
> POWER
TRANSMISSION
& DISTRIBUTION
The 400/110 kV electrical substation in Brașov has a particular importance for the National Power
System and for the local grid. It represents a junction for power lines connecting Muntenia, South
Transylvania and the poorly covered Moldovian area. The substation supplies the local consumption
area (around 167 MW) being also the connecting point for Brașov TPP.
Scope of the project: upgrading of the primary and secondary circuits in the 400/110kV substation, by
full refurbishing. The purpose is to complete a new 400 kV outdoor electrical substation, equipped
with the modern high-performance conventional installations, as well as a new indoor 110 kV
electrical substation, equipped with SF6 insulated installations (GIS cells).
Starting year: 2010
Commissioning year: 2013
Client: Transelectrica
Romelectro: EPC Contractor, Consortium Leader
CG Holdings Belgium NV: Consortium Partner
ISPE: Engineering and design
Electromontaj Carpați Sibiu: Erection and commissioning works
400/220 kV Roşiori Electrical Substation Retrofitting
PROJECTS › POWER
TRANSPORT
& DISTRIBUTION
PROJECTS
> POWER
TRANSMISSION
& DISTRIBUTION
Scope of the project:
• replacing the existing primary switch gear
• replacing the AT 400 MVA
• modernising the internal services
• introducing the numerical and SCADA protections and control systems - it is now possible for the
substation to be fully remote-controlled by means of the (territorial and national) dispatch
• retrofitting works on the drainage and sewage system
• modernising the heating, climatising, security as well as the fire extinction system.
Starting year: 2004
Commissioning year: 2006
Client: Transelectrica – Cluj Subsidiary
JACOBSEN Elektro As (Norway): Consortium Leader
Romelectro: Local Partner
Modernization of Electrical Substations
PROJECTS › POWER
TRANSPORT
& DISTRIBUTION
PROJECTS
> POWER
TRANSMISSION
& DISTRIBUTION
• Refurbishment of the 220/110 kV Barbo i Substation
• Refurbishment and modernization of 110 kV and 220 kV bays in FAI Substation
• Extension and modernization of the 110/20 kV Dumbrava - Sibiu Substation
• Primary equipment upgrade in the 110/20 kV Petrila Substation
• Refurbishment of the 220/110/20 kV Turnu Măgurele Substation
• Upgrade of the 110 kV bays in HPP Ciunget Substation
• Modernization of the 110 kV Electrical Substation of Râmnicu Vâlcea HPP
• Modernization of the 110 kV Electrical Substation of Govora HPP
• Refurbishment at the 110 kV bay – 220/110/20 kV Baia Mare Substation
• Modernization of the 220/110 kV Vetiş Electrical Substation
BARBOSI ELECTRICAL SUBSTATION 220/110kV
PROJECTS › POWER
TRANSPORT
& DISTRIBUTION
PROJECTS
> POWER
TRANSMISSION
& DISTRIBUTION
In 2013, Romelectro began the works for refurbishing the Barbosi substation, consisting of:
•Replacing the existing primary equipment in the substation due to their old age (over 30 years of
operation);
•Replacing the existing protections with modern digital protections;
•Introducing the central control system (SCADA) so that the substation will operate with no personnel;
•Increasing the safety in operation of the substation for both the electricity supply of the 0 (zero) degree
consumer - Arcelor Mittal Galati and the wind electricity transit in the Dobrogea area towards the
Moldova area through 220kV Lacul Sarat-Filesti OHTL in the 220kV Barbosi Substation - 220kV
Focsani Vest OHTL.
CLIENT:
Transelectrica – ST Constanta
PROJECT STARTING YEAR: 2013
PROJECT COMPLETION YEAR: 2014
PARTNERSHIP:
Romelectro: EPC Contractor, Consortium Leader
Electromontaj Carpati Sibiu: Consortium Partner
Connection of 99 MW Dumești and 30 MW Românești Wind
Power Plants to the National Power Grid
PROJECTS › POWER TRANSMISSION & DISTRIBUTION
Scope of the project: to connect the Dumeşti and Române ti Wind Farms to the National Power Grid
through a new 110 kV line cell executed in the 220/110 kV FAI Substation
The characteristics of this projects are:
• mounting of new 110 kV cell in the FAI substation, required to connect the new user;
• mounting the control and protection equipment in the FAI substation for the new 110 kV cell in
Dumeşti Wind Farm;
• providing a measurement group in the 110 kV FAI transformer station to meter the electricity
consumed /generated by the user;
• providing the equipment to monitor the quality of the electricity for the new 110 kV cell in Dumeşti
Wind Farm.
Starting year: 2013
Commissioning year: 2014
Client: Transelectrica
Romelectro: EPC Contractor
Refurbishment
BraduSubstation
Substation
Refurbishmentofofthe
the400/220/110
400/110 kVkVBrașov
PROJECTS
› POWER
TRANSMISSION
& DISTRIBUTION
PROJECTS
> POWER
TRANSMISSION
& DISTRIBUTION
The 400/220/110 kV Bradu Substation is of special importance for the National Power Grid and also
for Pitești and R”mnicu Vâlcea areas. It represents an important connection point of the Muntenia
and Oltenia networks with the one in Transylvania.
The main refurbishing works shall consist in:
• refurbishment of the 400 kV Substation, 220 kV Substation, 110 kV Substation and of 20 kV
Substation
• procurement and mounting of 2 x 400/400/80 MVA, 400/231/22 kV autotransformers
• procurement and mounting of 2 x 200/200/60 MVA, 231/121/10,5 kV autotransformers
• procurement and mounting of 2 x 16 MVA, 110/20 kV transformers
• control – protection (SCPA) and metering system
• remote protection and telecommunication systems
• refurbishing the DC and AC internal services installation
• constructions and architecture works
• achieving the 400 kV ân ăreni OHTL connection
Starting year: 2014
Commissioning year: 2018
Client: Transelectrica
Romelectro: EPC Contractor
Connection of 300 MW Ivești, 88 MW Falciu 1 and 18 MW Falciu 2 Wind Power
Grid
theSystem
Greenthrough
Fieldthe
800
CCGT Brazi
PlantsConnection
to the National of
Power
newMW
(400)/220/110
kV Banca
Substation
PROJECTS › POWER TRANSMISSION & DISTRIBUTION
Scope of the project: the (400)/220/110 kV Banca Substation was conceived to evacuate in National
Power Grid a power of approximately 406 MW generated by Ivesti, Falciu 1 and Falciu 2 Wind
Farms.
The characteristics of this projects are:
• execution of a (400)/220/110 kV transformer substation
• connection of the transformer substation in 220 kV DC Gutina -FAI and Gutina - Munteni OHTL
(belonging to Transelectrica-ST Bacău) by means of an approximately 0.3 km 220 kV DC OHTL
• regulating the coexistence of the 110 kV Bârlad- Ro ie ti OHTL (belonging to EoN Moldova) to the
220 kV OHTL in the Banca Substation;
Starting year: 2012
Commissioning year: 2013
Client: Transelectrica
Romelectro: EPC Contractor
Grid Connection
CCGT
Connection of
ofthe
theGreen
GreenField
Field860
800MW
MW
CCGTBrazi
Brazi
PROJECTS
› POWER
TRANSMISSION
& DISTRIBUTION
PROJECTS
> POWER
TRANSMISSION
& DISTRIBUTION
FACTS AND FIGURES
Scope of the project: supplying and installing two new
Overhead Transmission Lines in order to connect the Green
Field 860 MW CCGT (Combined Cycle Gas Turbine) Brazi
to the National Power System.
Connection point: 400/220/110 kV
Brazi West Substation
Length: 3 km
Starting year: 2008
Commissioning year: 2010
Client: OMV Petrom
Romelectro: EPC Contractor
Voltage level:
• 400 kV for the double circuit
DONAU type towers
• 220 kV for the simple circuit
RODELTA type towers
Distance between the axes: 80 m
44 Years of Sustainable Development on Domestic and
International Markets
Projects in Romania
THERMAL POWER PROJECTS
Project
Client
Contract performance
period
Execution of a Waste-to-Energy Plant and incorporating it within
Timi oara Sud TPP
International Recycling
Timi oara (IRE)
2014 – 2016
Rehabilitation and modernization of 330 MW Power Unit No. 4
operating on lignite in SE Rovinari; Modernization of the electric
power and automation plants
Oltenia Energy Complex –
SE Rovinari
2014 – 2014
Process water supply installation for the desulphurization plants
related to power units no. 4 and 5
Oltenia Energy Complex –
SE Rovinari
2014 – 2014
Execution of works for taking over the gypsum slurry from the flue
gas desulphurization plant of unit no. 4 to the dense slurry plant
related to unit no. 3
Oltenia Energy Complex –
SE Rovinari
2014 – 2014
Automation Works - Interconnection of the dense slurry plant to the Oltenia Energy Complex –
dry ash collecting and taking over plant of Cenextra related to the SE Turceni
project: "Ash collecting, transport and automatic loading plant, unit
no. 3
2014 – 2014
Rehabilitation / Modernization of the electrostatic precipitator in
power unit no. 7, execution and connection of the gas circuit
between power unit no. 7 and desulphurization plant no. 6
Oltenia Energy Complex –
SE Turceni
2014 – 2014
Interface execution between the dense slurry plant and the
desulphurization plant
Oltenia Energy Complex –
SE Turceni
2012 – 2014
Flue gas desulphurization plants for power units no. 7 and
no. 8 at I alniţa TPP
Oltenia Energy Complex –
SE Craiova
2012 – 2014
Modernization of the excitation system and protections of Unit 7
generator in I alni a TPP
Oltenia Energy Complex –
SE Craiova
2012 - 2014
Electrostatic precipitators modernization at Govora CHPP
Govora CHPP
2012 – 2013
Projects
ProjectsininRomania
Romania
THERMAL POWER PROJECTS
Proiect
Client
Contract performance
period
Solutions for discharge, transport and storage of the waste resulting Oltenia Energy Complex –
from the coal firing process at Turceni TPP, using dense slurry
SE Turceni
technology
2009 – 2012
Modernization and retrofitting of firing systems of
ELCEN Bucure ti
4 x 320 t/h gas fired boilers at Iernut TPP, by implementation of low Iernut TPP
NOx burners and automatic BMS
2009 – 2011
Modernization and retrofitting of firing systems of 5 x 420 t/h boilers
at Galati CHPP, by implementation of low NOx burners and
automatic BMS and DCS
Electrocentrale Gala i
Gala i CHPP
2008 – 2013
Investement for Combined Heat and Power Plant of 6 MWe and 80
Gcal in Buzău
Ecogen Buzău (IPP)
2008 – 2009
Increasing the stability of the slag and ash storage of I alni a (2 x
315 MW), on the right and left banks of Jiu river, using dense fluid
technology
SE Craiova
I alni a TPP
2008 – 2010
Refurbishment and upgrade of electrical and automation installation SE Rovinari
for 330 MW unit no. 6 at TPP Rovinari
2008 – 2010
New ash and slag deposit in Gârla and new installations for
collecting, preparation, discharge and storage of dense slurry in
Rovinari TPP (4 x 330 MW)
SE Rovinari
2008 – 2010
Increasing the stability of the Valea Mănăstirii slag and ash deposit
by executing the installations for ash and slag dense fluid and by
developing the storage for the first hightening
SE Craiova
Craiova II CHPP
2008 – 2010
Rehabilitation of the 420 t/h CR 1737 type boilers in order to
ELCEN Bucure ti
increase the safety in operation, especially on heavy fuel oil and for Progresu CHPP
dual operation, including low NOx burners – Progresu CHPP - boiler
2
2007 – 2007
Projects
ProjectsininRomania
Romania
THERMAL POWER PROJECTS
Project
Client
Contract performance
period
Rehabilitation of the 420 t/h CR 1737 type boilers in order to increase the
safety in operation, especially on heavy fuel oil and for dual operation,
including low NOx burners – Progresu CHPP, boilers 3 and 4
ELCEN Bucure ti
Progresu CHPP
2006 – 2007
Rehabilitation and modernizing of 315 MW unit no. 7 in Işalniţa TPP
SE Craiova
I alni a TPP
2005 - 2006
Rehabilitation of the firing installations for 525 t/h steam boiler no.2 in
Bucureşti Vest CHPP and no. 5 and 6 in Bucureşti Sud CHPP, by replacing
with modern low NOx burners
ELCEN Bucure ti
2004 – 2006
Refurbishment of 330 MW units no. 4 and 5 in Turceni TPP (Program A3)
Turceni TPP
1995 – 2003
Refurbishment of 330 MW units no. 3 and 7 in Turceni TPP
and no. 5 and 6 in Rovinari TPP (Program A2)
Turceni TPP
Rovinari TPP
1994 – 1998
Refurbishment of 330 MW units no. 2 and 6 in Turceni TPP
and no. 3 and 4 in Rovinari TPP (Program A1)
Turceni TPP
Rovinari TPP
1991 - 1994
HIDRO POWER PROJECTS
Project
Client
Contract performance
period
Hydropower development of the Jiu River on the Livezeni – Bumbeşti
strech, with the execution of 2 hydropower
plants with an installed power of 60 MW
Hidroelectrica
2004 – 2014
Rehabilitation of Voineasa Micro Hydro Power Plant,
Voineasa I, II, III
Romelectro
2009 – 2011
Projects
ProjectsininRomania
Romania
ELECTRICAL SUBSTATIONS
Proiect
Client
Contract performance
period
Rehabilitation of the 400/220/110/20 kV Bradu Substation
Transelectrica
2014 - 2018
Switching to a 400 kV voltage of the Por ile de Fier – Re i a –
Timi oara – Sacalaz – Arad axis/Stage I: Extension of the 400 kV
Por ile de Fier Substation
Transelectrica
Craiova Subsidiary
2013 - 2015
Rehabilitation of the 220/110 kV Barbo i Substation
Transelectrica
2012 - 2014
Turnkey (400)/220/110 kV Banca Substation
Transelectrica
2012 - 2013
Refurbishment of the 400/110 kV Braşov Substation
Transelectrica
2010 – 2013
Refurbishment and modernization of the 110 kV and 220 kV
bays in FAI Substation
Transelectrica
Bacău Subsidiary
2007 - 2011
Extension and modernization aiming to increase the safety
in operation of the 110/20 kV Dumbrava Sibiu Substation
Electrica Transilvania
Sud
2007 – 2009
Primary equipment upgrade in the 110/20 kV Petrila Substation
Transelectrica
2007 – 2007
Refurbishment of the 220/110/20 kV Turnu Măgurele Substation
Transelectrica
2006 - 2011
Modernization of the protection systems of 250 MVA transformer and Transelectrica
110 kV PDB in 400/110 kV Braşov, Dârste, Domneşti, Medgidia Sud,
Pelicanu, Tulcea Vest, Smârdan, Drăgăneşti Olt Substations
2006 – 2009
Upgrade of the 110 kV bays in HPP Ciunget Substation
Hidroelectrica
Râmnicu Vâlcea
Subsidiary
2006 – 2008
Modernization of the 110 kV Electrical Substation of
Râmnicu Vâlcea HPP
Hidroelectrica
Râmnicu Vâlcea
Subsidiary
2006 - 2007
Projects
ProjectsininRomania
Romania
ELECTRICAL SUBSTATIONS
Proiect
Client
Contract performance
period
Modernization of the 110kV Electrical Substation of Govora HPP
Hidroelectrica
Râmnicu Vâlcea Subsidiary
2006 – 2007
Turnkey refurbishment of the 110/10 (20) kV Bucureşti Centru Substation
Electrica Muntenia
Sud
2005 – 2007
Refurbishment at the 110 kV bay – 220/110/20 kV Baia Mare Substation
Transelectrica
2005 – 2005
Refurbishment of the 400/220 kV Roşiori Electrical Substation
Transelectrica
Cluj Subsidiary
2004 – 2006
Modernizing works at the 220/110 kV Vetiş Electrical Substation
Transelectrica
Cluj Subsidiary
2004 – 2006
Turnkey modernization of the 110/20 kV Electrical Substation
Borsec
Electrica Transilvania Sud
2003 – 2005
Turnkey modernization of the 110/10 kV Cluj Centru Electrical Substation
Electrica Transilvania Nord
2003 - 2004
Turnkey refurbishment of the 6(20) kV Fileşti – Galaţi connection
Substation
Electrica Muntenia Nord
2002 – 2003
Projects
ProjectsininRomania
Romania
OVERHEAD TRANSMISSION LINES
Proiect
Client
Contract performance
period
Connection to the Electricity Transmission Network of 99 MW Dume ti
Wind Farm and 30 MW Române ti Wind Farm, by executing a 110 kV
line cell in the 220/110 kV Fai Substation
Transelectrica
Bacau Subsidiary
2013 - 2014
Coexistence conditions between the existing 110 kV Bârlad – Ro iori
OHTL and new 220 kV OHTL connections for the (400)/220/110
kV Banca Substation for connecting 300 MW Ive ti, 88 MW Falciu and
18 MW Falciu 2 Wind Farms to the electric grid
Transelectrica
2012 - 2013
Top overhaul of 400 kV Mintia-Sibiu OHTL
Transelectrica
2011 - 2014
Rehabilitation of the 220 kV OHTL Lotru - Sibiu
Transelectrica
2007 – 2010
400 kV OHTL Oradea – Nadab – Békéscsaba, new interconnexion line
with Hungary
Transelectrica
2006 – 2008
Rehabilitation of the 400 kV Bucureşti South – Gura Ialomiţei OHTL
Transelectrica
2006 - 2007
Execution of 220kV and 400 kV connections of Iernut Substations
Transelectrica
2005 – 2006
Emergency works of the Sibiu – ân ăreni 400 kV OHTL
Transelectrica
2005 – 2005
Rehabilitation of 220 kV Brazi Vest – Târgovişte OHTL
Transelectrica
2004 - 2005
Improving the dispatcher transmission system by executing the
interconnecting of the data transmission system between the National
Dispatch Centers in Romania and Bulgaria
Transelectrica
2003 – 2004
Rehabilitation of 220 kV Borzeşti – Gutinaş OHTL
Transelectrica
2003 – 2003
Major
Projects
in Asia
Projects
in Romania
PHILIPPINES
Project
Client
Contract performance
period
138 kV Compostela - Banilad OHTL
National Electric Power
Corporation (NPC)
1994 – 1999
National Electric Power
Corporation (NPC)
1994 – 1999
Project
Client
Contract performance
period
230 kV OHTL Phuket Junction - Phuket 2
Electricity Generating
Authority of Thailand
(EGAT)
1998 – 2002
Electricity Generating
Authority of Thailand
(EGAT)
1998 – 2000
Technical specification:
Foundation pads and chimneys, double triangle hot zinc plated poles, active
2xACSR 400 mm2 Condor conductors, silicon rubber insulation, OPGW and
AWG 7 and 6 safety conductors.
230 kV Talisay - Compostela OHTL
Technical specifications:
Foundation pads and chimneys, double triangle hot zinc-plated poles, active
ACSR 772 mm2 MARTIN conductors, silicon rubber insulation, OPGW and
AWG 7 and 6 safety conductors.
THAILAND
Technical specifications:
Foundation pads and chimneys, double triangle hot zinc plated poles, active
795 MCM ACSR/AW phase conductors, porcelain insulation, OPGW and
AWG 7 and 8 safety conductors.
230 kV OHTL Phangnga - Phuket 2
Technical specifications:
Foundation pads and chimneys, double triangle hot zinc plated poles, active
2x1272 MCM ACSR/AW PHEASANT conductors, porcelain insulation,
OPGW and AWG 7 and 8 safety conductors.
Major
Projects
in Middle East
Projects
in Romania
JORDAN
Project
Client
Project completion
date
D.C Bayader - Amman - Quatrana - Ghar Safi - Ma’an 132 kV OHTL
(310 km)
Jordan Electric Authority
1982
D.C. Ma’an - Aqaba and Amman – Sahab 132 kV OHTL (210 km)
Jordan Electric Authority
1984
D.C. Irbid - Yarmouk University 33 kV OHTL (12 km)
Yarmouk University
1984
D.C. Subeihi - 33kV OHTL King Talal dam (11 km)
Yarmouk University
1986
D.C. Irbid - Wadi Arab 33 kV OHTL (25 km)
Jordan Electric Authority
1986
846A JEPCO – Bringing electricity to 14 villages
Jordan Electric Power
Company
1986
Zarqa – Sabha 132 kV OHTL (40 km)
National Electric Power
Corporation
1995
25 / 84 – 33 kV and 11kV Medium Voltage OHTL (160 km)
Jordan Electric Authority
1987
D.C. Ma’an - Esheidiyeh - Kharrana - Azraq - Rishah 132kV OHTL
(327 km)
Jordan Electric Authority
1988
Queen Alia International Airport – Sweima 132 kV OHTL (38 km)
National Electric Power
Corporation
2000
Subeihi - Waqqas 132 kV OHTL
National Electric Power
Corporation
2005
Major
Projects
in Middle East
Projects
in Romania
IRAQ
Project
Client
Project completion
date
33 kV S.C. OHTL (Northern Area – 210 km; Central Area – 220 km;
Western Area – 400 km)
General Rural Electricity
Department
1984
33 kV S.C. OHTL (Baghdad Area – 90 km)
Baghdad Electrical
Distribution
1986
400 kV D.C. OHTL Musaiyb - Baghdad South Musaiyb – Babylon
(87.5 km)
Major Electrical Projects
Implementation
Department
1988
400 kV D.C. OHTL Babylon – Qadisiya (101.5 km)
Major Electrical Projects
Implementation
Department
1988
D.C. Tuba – 6.9 km; Hammar – 7.5 km; 132 kV OHTL; Ramadi –
11.1km Samadiya – 1.8 km; Mashtel – 0.4 km; Annah – 2.4 km
Major Electrical Projects
Implementation
Department
1989
D.C. Arbil – Dokan 132 kV OHTL (83.8 km)
Major Electrical Projects
Implementation
Department
1989
132 kV D.C. OHTL Darbandikhan - Sulaimaniya 111.5 km (Kirkuk
Industries – 5 km; Tarmia - 14.8 km, Musaiyb - 42.2 km)
Major Electrical Projects
Implementation
Department
1989
Major
Projects
in Middle East
Projects
in Romania
ELECTRIC TRANSFORMERS & DISTRIBUTION SUBSTATION
Project
Country
Client
Contract performance
period
Sheich Said -(Aleppo)
Syria
Sheich Said – Aleppo Cement
Factory
1975 - 1977
Al Quaim Cement Plant 2X34 MVA; 33/6.6 kV
Iraq
Ministry of Industry and Minerals 1982– 1985
Sinjar Cement Plant S/S
Iraq
Ministry of Industry and Minerals 1982 – 1985
AL Quaim Limestone Quarry S/S
Iraq
Ministry of Industry and Minerals 1994 – 1999
TECHNICAL ASSISTANCE, CONSULTING & EQUIPMENT SUPPLY
Project
Country
Client
Contract performance
period
Technical assistance and consulting on operating and
repairing equipment
Kuwait
Ministry of Energy and Water
1991 - 1999
Delivery of telecommunication poles
Kuwait
National Mobil
Telecommunication Company
1998– 1998
Delivery of telecommunication poles
Kuwait
National Mobil
Telecommunication Company
1999 – 1999
Technical assistance and consulting on operating and
repairing equipment
United Arab
Emirates
(Abu Dhabi)
Technical assistance and
consulting on operating and
repairing equipment
1999 – 2001
Major
Projects
in Middle East
Projects
in Romania
IRAN
Turnkey execution of the Vafregan dam
Short description of the objective
Arch-shaped concrete dam, having an accumulation volume of 230 million cubic meters, which has
been built with a view to ensuring water supply for the city of Saveh and also, to providing irrigation to
an area of nearly 60.000 ha. At the same time, a hydroelectric plant has been built, having an overall
installed capacity of 11 MW.
Client
Teheran Regional Water Board (TRWB)
Location
Iran, 200 km south of Teheran
Project completion date
1992
Partnership
RAH VA SAHTEMAN (MOLAVI) Teheran - associate partner
Major
Projects
in North Africa
Projects
in Romania
ALGERIA
Feasibility studies for the RAMDANE DJAMEL and ZAOUIA dams. Expertise
of the Technical Project for the dams BOUGOUS and Bouhalloufa
Description
The core business of the contract consisted of Romelectro conducting the projects for the Ramdane
Djamel and Zaouia dams in the Feasibility Study stage.
According to the Special Prescription Book, the services were provided in the following 5 stages:
Stage 1: Defining the options and the reconaissance program
Stage 2: Hydrological study
Stage 3: Geological and geo-technical study
Stage 4: Solution study
Stage 5: Feasibility study and bid documents
Also, for the same client, Agence Nationale des Barrages et Transfert (ANBT), the expertise of the
technical project for Bouhalloufa and Bougous was conducted. The core business of the contract was
for the APD study expertise to be conducted APD according to the Special Prescription Book.
Project starting date
November 2002 (Ramdane and Zaouia)
May 2001 (Bougous)
April 2002 (Bouhalloufa)
Project completion date
November 2003 (Ramdane and Zaouia)
April 2002 (Bougous)
September 2002 (Bouhalloufa)
Major
Projects
in North Africa
Projects
in Romania
ALGERIA
EL-Fakia dam execution
Short description of the objective
Dam made of rock blocks piles endowed with a clay core, 49 m high and a 390m crown, which has
been built with a view to ensuring water supply for the city of M’Sila and also, to irrigating
80.000 ha of farm land.
Client: Directorate for Hydraulic Projects and Works (DHPW)
Location: Algeria, 30 km from M’Sila
Project completion date: 1985
SONAGHTER - associate local partner
Turnkey heightening of the Ksob dam
Short description of the objective
Romelectro has conducted the works aimed at heightening the existing dam by
10m by means of a turnkey contract. It is a complex project which has called for
rock excavations of over 37.000 cm,
casings of over 100.000 mp and nearly 2.500 tones of metallic partners.
Client: Directorate for Hydraulic Projects (DHP)
Location: Algeria, Pre-Sahara area, 30 km from the city of M’Sila
Project completion date: 1976
SONAGHTER -associate local partner
Other projects abroad
Transformers and Distributions Substations
1. Performance of studies, designs and technical assistance
Morocco Sidi - Benour Substation
Kenya
China
Peru
Kinogoni Mining Complex Substation
Sini - Veni TPP
various locations
2. Turnkey projects:
Bangladesh 21 sets of 33/11 kV 2.5 and 5 MWA transformer substations
25 sets of 11/0.4 kV 100-200 kVA transformer substations
Pakistan
The Lasbella 132/63 kV 2x25 MWA transformer substation
Iraq
The Al Qaim 33/6.6 kV 2x34 MWA + 132/6.6 10 MWA
transformer
substation
The Sinjar 33/6.6 kV 3x34 MWA transformer substation
Other projects abroad
Client
Country
Project Type
Scope of supply
Consulting
Engineer
Year
JEPCO
Jordan
Turnkey
GLST - 132 kV T/L
NEPA
2000
NAPOCOR
Philippines
Turnkey
GLST, assembling elements
- 500 kV
Edwin
Ladingnon
2000
Intracom SA Greece,
Intrarom SA Romania
Romania
Supply
Hot dip galvanised tubular steel
antenna towers - 30, 50 m high
Intrarom SA
2000
NMTC
Kuwait
Turnkey
Lattice steel antenna towers
- 70 m high
NMTC
2000
Hayat
Kuwait
Supply
Lattice steel antenna towers
- 64 m high
NMTC
2000
NMTC
Kuwait
Supply
Hot dip galvanized tubular
steel towers for antennae
- 40, 75, 100 m high
MTCo
2000
NMTC
Kuwait
Supply
Hot dip galvanized tubular steel
towers for antennae
- 25, 30, 40, 75 m high
MTCo
1999
MEM
Peru
Design,
Testing,
Supply
GLST - 220 kV
MEM
1999
JEPCO
Jordan
Turnkey
GLST, assembling
elements - 132 kV
NEPA
1998
Other
Majorprojects
Exportabroad
Projects
Client
Country
Project Type
Scope of Supply
Consulting
Engineer
Year
MEM
Peru
Design,
Testing,
Supply
GLST - 138 kV
MEM
1998
ONUR CIVATA
Turkey
Supply
Fittings
JEPCO
Jordan
Supply,
Erection
GLST - 132 kV
NEPCO
1998
Consorcio GyM Cosapi
Peru
Supply
GLST - 220 kV
MEM
1998
Consorcio Cosapi
-Abengoa
Peru
Supply
GLST - 220 kV
MEM
1998
Consorcio Cosapi
-Balarezo
Peru
Supply
GLST - 138 kV
MEM
1998
EGAT
Thailand
Design,
Testing,
Supply
GLST, assembling
elements - 115, 230 kV
EGAT
1997
MEM
Peru
Design,
Testing,
Supply
GLST, assembling
elements - 60-138 kV
MEM
1997
Mobifon
Romania
Supply
Hot dip galvanized
lattice steel towers for
telecommunications
- 40 m high
MOBIFON
1997
1998
Other
Majorprojects
Exportabroad
Projects
Client
Country
Project Type Scope of Supply
Consulting
Engineer
Year
National Mobile
Telecommunication Co.
(NMTC)
Kuwait
Supply
Steel lattice towers for
antennae - 70 m high
MTCo
1997
TREC
Iran
Design,
Testing,
Supply
GLST, assembling
elements - 230 kV
Moshanir
1997
EEA
Egypt
Supply
Fittings
EEA
1997
NAPOCOR
Philippines
Turnkey
GLST - 138, 230 kV
Sweed Power &
EEDD-NPC
1997
Public Establishment for
Distribution and Exploitation
of Electric Energy
Syria
Supply
Gantry towers for
transformer station,
clamps & fittings - 66/20 kV
PEDEEE
1996
National Electric Power
Authority
Nigeria
Supply
GLST, lighting poles, gantry NEPA
towers for
132/33 kV substation
1996
Avangan
Iran
Design,
Testing
GLST - 230 kV
Moshanir
1996
Ministry of Energy and Mines Peru
(MEM)
Supply
GLST - 60 kV
MEM
1995,
1996
National Power Corporation
(NAPOCOR)
Turnkey
GLST, clamps, fittings,
composite insulator strings,
power conductors, OHGW,
OPGW - 132, 230 kV
Sweed Power
1995
Philippines
Other
Majorprojects
Exportabroad
Projects
Client
Country
Project
Type
Scope of Supply
Consulting
Engineer
Year
Power Generation
and Transmission
Co. - Ramin
Iran
Design,
Testing,
Supply
GLST, assembling
elements - 230 kV
Ghods Niroo
1995
K.E.SH. - Tirana
Albania
Supply
Clamps & fittings
- 132 kV
K.E.SH.
1995
Moshanir P.E. Co.
Iran
Design,
Testing
GLST - 230 kV
Moshanir
1995
Tavanir
Iran
Design,
Testing
GLST - 63 kV
MATN
1995
TREC
Iran
Design,
Testing,
Supply
GLST - 400 kV
Moshanir
1993
TREC
Iran
Design,
Testing,
Supply
GLST, assembling
elements - 230 kV
Moshanir
1993
AREC
Iran
Design,
Testing,
Supply
Clamps & fittings - 154,
132, 230 kV
Moshanir
1993
KWPA
Iran
Supply
AAAC conductor
Moshanir
1993
National Iranian
Copper Industry
Co. - Sirjan
Iran
Design,
Testing,
Supply
GLST, clamps, OHGW –
230 kV
Moshanir
1993
Other
Majorprojects
Exportabroad
Projects
Client
Country
Project
Type
Scope of Supply
Consulting
Engineer
Year
Ministry of Energy
and Water
Kuwait
Supply
Steelworks, assembling
elements
MEW
1993
JEA
Jordan
Turnkey
GLST - 132 kV
JEA
1993
BREC
Iran
Design,
Clamps - 230 kV
Testing, Supply
Moshanir
1993
West Regional Electric Co.
(WREC)
Iran
Design,
Clamps & fittings –
Testing, Supply 63, 132 kV
Gharb Niroo
1993
Bakhtaran Regional Electric
Co. (BREC)
Iran
Design,
GLST, clamps, assembling
Testing, Supply elements
- 230 kV
Moshanir
1993
BREC
Iran
Design,
GLST, assembly elements –
Testing, Supply 400 kV
Moshanir
1993
WREP
Iran
Design,
GLST - 132 kV
Testing, Supply
Gharb Niroo
1992
JEA
Jordan
Design, Supply, GLST - 132 kV
Erection
JEA
1992,
1994
KWPA
Iran
Design,
Testing,
Supply
Ghods Niroo
1992
GLST, clamps & fittings,
assembling elements,
insulators - 400 kV
Other
Majorprojects
Exportabroad
Projects
Client
Country
Project
Type
Scope of Supply
Consulting
Engineer
Year
WREP
Iran
Design,
Testing,
Supply
GLST, assembling
elements - 63 kV
Moshanir
1992
Guilan Regional
Electric Co. (GREC)
Iran
Design,
Testing,
Supply
GLST, assembling
elements - 230 kV
Moshanir
1992
Avangan Co.
Iran
Supply
Galvanized bolts & nuts
AREC
Iran
Design,
Testing, Supply
GLST, assembling
elements - 230, 400 kV
Mona Co.
1992
Tehran Regional
Electric Co. (TREC)
Iran
Design,
Testing,
Supply
GLST, assembling
elements - 400 kV
Moshanir
1992
EAC
Cyprus
Supply
GLST - 132 kV, tower cross EAC
arms
1992
Telecommunications
Co. of Iran
Iran
Supply
Assembling elements
1992
AREC
Iran
Design,
Testing,
Supply
GLST, assembling
Moshanir
elements, clamps & fittings,
insulators - 230 kV
1991
Electrification of a railway
station –
Salonic Idomeni
Greece
Supply
Lattice horizontal
galvanized girders
1991
1992
Odon
Odostromaton
Other
Majorprojects
Exportabroad
Projects
Client
Country
Project
Type
Scope of Supply
Consulting
Engineer
Year
EAC
Cyprus
Supply
Galvanized steel cross arms
EAC
1991
AREC
Iran
Supply
GLST, clamps and fittings
insulators and earth system
- 63,132, 230 kV
Moshanir
1991
AREC
Iran
Design,
Testing,
Supply
GLST, assembly elements,
clamps - 132/154 kV
interconnection
Moshanir
1991
Azerbaijan Regional Electric
Co. (AREC)
Iran
Supply
GLST - 400 kV
Moshanir
1990
EAC
Cyprus
Supply
GLST - 132 kV
EAC
1990
Boyer Tirana
Albania
Supply
Clamps & fittings, insulators
Boyer
1990
EEA
Egypt
Design, Supply GLST and assembling elements EEA
- 220 kV
1990
WREP
Iran
Turnkey
GLST - 63, 132 kV
Mahab Ghodss
1989
EAC
Cyprus
Design,
Supply
GLST - 132 kV
EAC
1989
Other
Majorprojects
Exportabroad
Projects
Client
Country
Project
Type
Scope of Supply
Consulting
Engineer
Year
DGMPRE
Iraq
Design,
Testing,
Supply
Conductors - 400 kV
DGMPRE
1988
JEA
Jordan
Turnkey
GLST -132 kV
JEA
1987
Electricity Authority of
Cyprus (EAC)
Cyprus
Design, Supply GLST - 132 kV
EAC
1987
DGMPRE
Iraq
Turnkey
DGMPRE
1986,
1987
DGMPRE
Iraq
Design, Supply Materials - 132 kV
DGMPRE
1986
EEA
Egypt
Turnkey
EEA
1986
EEA
Egypt
Design, Supply Clamps & fittings,
insulators - 220 kV
EEA
1986
DGMPRE
Iraq
Turnkey
DGMPRE
1985
Ewbank
1984
Public Corporation for Electric South
Power
Yemen
GLST - 132 kV
GLST - 220 kV
GLST - 400 kV
Design, Erection Wooden poles –
11, 33 kV
Other
Majorprojects
Exportabroad
Projects
Client
Country
Project
Type
Scope of Supply
Consulting
Engineer
Year
Egyptian Electricity Authority Egypt
(EEA)
Turnkey
GLST - 220 kV
EEA
1984
JEPCO
Jordan
Turnkey
Spun concrete
poles - 11, 33 kV
JEA and JEPCO
1984
Jordan Valley Authority
Jordan
Turnkey
GLST - 33 kV
Stanley Consultants
Inc. + Harza Eng.
(USA)
1983,
1984
DGMPRE
Iraq
Turnkey
GLST - 63 kV
DGMPRE
1983
West Regional Electric
Power (WREP)
Iran
Turnkey
GLST - 63 kV
Mahab Ghodss
1983
WREP
Iran
Turnkey
GLST - 132 kV
Mahab Ghodss
1983
Electricity Board of the
States of Malaya
Malaysia
Turnkey
GLST - 132 kV
Crown Agency
1983
Yarmouk University
Jordan
Turnkey
GLST - 33 kV
Preece, Cardew &
Rider
1982
KWPA
Iran
Design,
Supply
GLST - 132, 230 kV
Motor Columbus
1982
Other
Majorprojects
Exportabroad
Projects
Client
Country
Project
Type
Scope of Supply
Consulting
Engineer
Year
Directorate General Of Minor Iraq
Projects & Rural
Electrification
Baghdad Electricity
Distribution (DGMPRE)
Turnkey
GLST - 33 kV
DGMPRE
1981
JEPCO
Jordan
Turnkey
GLST - 132 kV
Ewbank (GB)
1981
Jordan Electricity Authority
(JEPCO)
Jordan
Turnkey
GLST - 132 kV
Preece, Cardew
1979
Azerbaidjan Regional Electric Iran
Co. (AREC)
Turnkey
GLST - 63 kV
Mahab Ghodss
1978
TAVANIR
Iran
Turnkey
GLST - 230 kV
Motor Columbus
(Switzerland)
1977,
1982
KWPA
Iran
Turnkey
GLST - 230 kV
Development &
Resources
1975
Khuzestan Water and Power Iran
Authority (KWPA)
Turnkey
GLST - 132 kV
Development &
Resources (USA)
1975
Electricité du Liban
Lebanon
Turnkey
GLST - 150 kV
Surveillance de Geneve 1975
(Switzerland)
Electricité du Liban
Lebanon
Turnkey
GLST - 66 kV
Lebanon Electricity
1972
ROMELECTRO GROUP
PHONE:
+4 021 2004 300
+4 021 2061 076
e-mail:
office@romelectro.ro
office@ispe.ro
FAX:
+4 021 2004 375
www.romelectro.ro
www.ispe.ro
www.celpi.ro
www.elmontaj.ro
Address:
1-3 Lacul Tei Blvd.
020371 Bucharest, Romania