SEATTLE — The new, billion-dollar international terminal at Seattle’s airport that opened last year was supposed to fit 20 large planes side by side. But it can only fit 16 long-haul aircraft simultaneously because of flaws in the design, sparking a legal battle between the Port of Seattle and the lead contractor for the project, The Seattle Times reported.

In a letter sent in August to Clark Construction, which built the new facility, the port said the 20% shortfall in capacity could cause “damages to the Port’s operations in the tens or hundreds of millions of dollars over the expected life of this project.”

Our journalism needs your support. Please become a subscriber today at The Bulletin, www.bendbulletin.com/subscribe-now.
Sign up for our Daily Headlines newsletter

(0) comments

Welcome to the discussion.

Keep it Clean. Please avoid obscene, vulgar, lewd, racist or sexually-oriented language.
PLEASE TURN OFF YOUR CAPS LOCK.
Don't Threaten. Threats of harming another person will not be tolerated.
Be Truthful. Don't knowingly lie about anyone or anything.
Be Nice. No racism, sexism or any sort of -ism that is degrading to another person.
Be Proactive. Use the 'Report' link on each comment to let us know of abusive posts.
Share with Us. We'd love to hear eyewitness accounts, the history behind an article.