Berlin schonefeld airport terminal building Stock Photos and Images
RM2D8N630–10/31/2020, Schönefeld, Germany, Arrival of the first Lufthansa flight at the new Berlin Brandenburg Willy Brandt Airport in Schönefeld.. Arrival of the first two flights from easyJet and Lufthansa to the new Berlin Brandenburg Willy Brandt Airport in Schönefeld. on October 31th.
RM2DD3AX9–05 November 2020, Brandenburg, Schönefeld: Panoramic view from the parking lot to the entrance of the government terminal on the area of the airport Berlin Brandenburg (BER). Since the end of October 2020 the new government airport on the military part of the new airport Willy Brandt is in operation. The new terminal in Schoenefeld serves the Federal Foreign Office and the Federal Ministry of Defense (BMVg) flight operations department as a check-in building for federal government flights, as well as a reception area for state visits. Photo: Bernd von Jutrczenka/dpa
RM2D8N5T3–10/31/2020, Schönefeld, Germany, Arrival of the first Lufthansa flight at the new Berlin Brandenburg Willy Brandt Airport in Schönefeld.. Arrival of the first two flights from easyJet and Lufthansa to the new Berlin Brandenburg Willy Brandt Airport in Schönefeld. on October 31th.
RM2DD3976–05 November 2020, Brandenburg, Schönefeld: On the side facing the airfield, large glass surfaces characterize the new government terminal, to which the federal eagle and the lettering 'Federal Republic of Germany' are attached, on the grounds of Berlin Brandenburg Airport (BER). Since the end of October 2020, the new government airport has been in operation on the military part of the new Willy Brandt Airport. The new terminal in Schönefeld serves the Federal Foreign Office and the Federal Ministry of Defense (BMVg) flight operations department as a check-in building for Federal Government fli
RM2D8N5TE–10/31/2020, Schönefeld, Germany, Arrival of the first Lufthansa flight at the new Berlin Brandenburg Willy Brandt Airport in Schönefeld.. Arrival of the first two flights from easyJet and Lufthansa to the new Berlin Brandenburg Willy Brandt Airport in Schönefeld. on October 31th.
RM2DD396K–05 November 2020, Brandenburg, Schönefeld: A sign with the inscription 'Kolonnenaufstellfläche' (Column Area) is located in front of the government terminal on the grounds of Berlin Brandenburg Airport (BER). The new government airport on the military part of the new Willy Brandt Airport has been in operation since the end of October 2020. The new terminal in Schoenefeld serves the Federal Foreign Office and the Aircraft Readiness Department of the Federal Ministry of Defence (BMVg) as a check-in building for flights of the Federal Government, as well as a reception area for state visits. Phot
RM2D7W5WK–25 October 2020, Brandenburg, Schönefeld: Panoramic view in the evening to the capital airport Berlin Brandenburg 'Willy Brandt' (BER). In the same evening the building was renamed 'BER Terminal 5' by the airport Berlin Schönefeld. Berlin's airports will be given the new abbreviation BER. A few days before the opening of the new capital city airport, the previous codes TXL (Tegel) and SXF (Schoenefeld) are no longer used when the winter flight schedule is changed. The opening of the Capital Airport BER is planned for 31.10.2020. Photo: Patrick Pleul/dpa-Zentralbild/ZB
RM2DD3AXF–05 November 2020, Brandenburg, Schönefeld: Seating is available in a meeting room in the VIP area of the government terminal on the grounds of Berlin Brandenburg Airport (BER). Since the end of October 2020, the new government airport on the military part of the new Willy Brandt Airport is in operation. The new terminal in Schoenefeld serves the Federal Foreign Office and the Federal Ministry of Defense (BMVg) flight operations department as a check-in building for federal government flights, as well as a reception area for state visits. Photo: Bernd von Jutrczenka/dpa
RM2D8N5PC–10/31/2020, Schönefeld, Germany, Arrival of the first Lufthansa flight at the new Berlin Brandenburg Willy Brandt Airport in Schönefeld.. Arrival of the first two flights from easyJet and Lufthansa to the new Berlin Brandenburg Willy Brandt Airport in Schönefeld. on October 31th.
RM2DD2MWA–05 November 2020, Brandenburg, Schönefeld: Seating is available in a meeting room in the VIP area of the government terminal on the grounds of Berlin Brandenburg Airport (BER). Since the end of October 2020, the new government airport on the military part of the new Willy Brandt Airport is in operation. The new terminal in Schoenefeld serves the Federal Foreign Office and the Federal Ministry of Defense (BMVg) flight operations department as a check-in building for federal government flights, as well as a reception area for state visits. Photo: Bernd von Jutrczenka/dpa
RM2D8N5TA–10/31/2020, Schönefeld, Germany, Arrival of the first Lufthansa flight at the new Berlin Brandenburg Willy Brandt Airport in Schönefeld.. Arrival of the first two flights from easyJet and Lufthansa to the new Berlin Brandenburg Willy Brandt Airport in Schönefeld. on October 31th.
RM2DD3AXW–05 November 2020, Brandenburg, Schönefeld: Seating is available in a meeting room in the VIP area of the government terminal on the grounds of Berlin Brandenburg Airport (BER). Since the end of October 2020, the new government airport on the military part of the new Willy Brandt Airport is in operation. The new terminal in Schoenefeld serves the Federal Foreign Office and the Federal Ministry of Defense (BMVg) flight operations department as a check-in building for federal government flights, as well as a reception area for state visits. Photo: Bernd von Jutrczenka/dpa
RM2D8N5X7–10/31/2020, Schönefeld, Germany, Arrival of the first easyJet and the first Lufthansa flight at the new Berlin Brandenburg Willy Brandt Airport in Schönefeld.. Arrival of the first two flights from easyJet and Lufthansa to the new Berlin Brandenburg Willy Brandt Airport in Schönefeld. on October 31th.
RM2DD396Y–05 November 2020, Brandenburg, Schönefeld: Seating is available in a meeting room in the VIP area of the government terminal on the grounds of Berlin Brandenburg Airport (BER). Since the end of October 2020, the new government airport on the military part of the new Willy Brandt Airport is in operation. The new terminal in Schoenefeld serves the Federal Foreign Office and the Federal Ministry of Defense (BMVg) flight operations department as a check-in building for federal government flights, as well as a reception area for state visits. Photo: Bernd von Jutrczenka/dpa
RM2D8N63Y–10/31/2020, Schönefeld, Germany, Arrival of the first easyJet and the first Lufthansa flight at the new Berlin Brandenburg Willy Brandt Airport in Schönefeld.. Arrival of the first two flights from easyJet and Lufthansa to the new Berlin Brandenburg Willy Brandt Airport in Schönefeld. on October 31th.
RM2DD3AXN–05 November 2020, Brandenburg, Schönefeld: On the side facing the airfield, large glass surfaces characterize the new government terminal on the grounds of Berlin Brandenburg Airport (BER). Since the end of October 2020, the new government airport has been in operation on the military part of the new Willy Brandt Airport. The new terminal in Schoenefeld serves the Foreign Office and the Air Mission Wing of the Federal Ministry of Defence (BMVg) as a check-in building for flights of the German government, as well as a reception area for state visits. Photo: Bernd von Jutrczenka/dpa
RM2D8N5TN–10/31/2020, Schönefeld, Germany, Arrival of the first easyJet and the first Lufthansa flight at the new Berlin Brandenburg Willy Brandt Airport in Schönefeld.. Arrival of the first two flights from easyJet and Lufthansa to the new Berlin Brandenburg Willy Brandt Airport in Schönefeld. on October 31th.
RM2DD3AXB–05 November 2020, Brandenburg, Schönefeld: Seating is available in a meeting room in the VIP area of the government terminal on the grounds of Berlin Brandenburg Airport (BER). Since the end of October 2020, the new government airport on the military part of the new Willy Brandt Airport is in operation. The new terminal in Schoenefeld serves the Federal Foreign Office and the Federal Ministry of Defense (BMVg) flight operations department as a check-in building for federal government flights, as well as a reception area for state visits. Photo: Bernd von Jutrczenka/dpa
RM2D8N5Y7–10/31/2020, Schönefeld, Germany, Arrival of the first easyJet and the first Lufthansa flight at the new Berlin Brandenburg Willy Brandt Airport in Schönefeld.. Arrival of the first two flights from easyJet and Lufthansa to the new Berlin Brandenburg Willy Brandt Airport in Schönefeld. on October 31th.
RM2DD2MXA–05 November 2020, Brandenburg, Schönefeld: On the side facing the airfield, large glass surfaces characterize the new government terminal on the grounds of Berlin Brandenburg Airport (BER). Since the end of October 2020, the new government airport has been in operation on the military part of the new Willy Brandt Airport. The new terminal in Schoenefeld serves the Foreign Office and the Air Mission Wing of the Federal Ministry of Defence (BMVg) as a check-in building for flights of the German government, as well as a reception area for state visits. Photo: Bernd von Jutrczenka/dpa
RM2D8N5P6–10/31/2020, Schönefeld, Germany, Arrival of the first easyJet and the first Lufthansa flight at the new Berlin Brandenburg Willy Brandt Airport in Schönefeld.. Arrival of the first two flights from easyJet and Lufthansa to the new Berlin Brandenburg Willy Brandt Airport in Schönefeld. on October 31th.
RM2DD396H–05 November 2020, Brandenburg, Schönefeld: Seating is available in a meeting room in the VIP area of the government terminal on the grounds of Berlin Brandenburg Airport (BER). Since the end of October 2020, the new government airport on the military part of the new Willy Brandt Airport is in operation. The new terminal in Schoenefeld serves the Federal Foreign Office and the Federal Ministry of Defense (BMVg) flight operations department as a check-in building for federal government flights, as well as a reception area for state visits. Photo: Bernd von Jutrczenka/dpa
RM2D8N5Y2–10/31/2020, Schönefeld, Germany, Arrival of the first easyJet and the first Lufthansa flight at the new Berlin Brandenburg Willy Brandt Airport in Schönefeld.. Arrival of the first two flights from easyJet and Lufthansa to the new Berlin Brandenburg Willy Brandt Airport in Schönefeld. on October 31th.
RM2DD2MW9–05 November 2020, Brandenburg, Schönefeld: A small sign with an aircraft hangs in the check-in area of the government terminal on the grounds of Berlin Brandenburg Airport (BER). Since the end of October 2020, the new government airport on the military part of the new Willy Brandt Airport is in operation. The new terminal in Schoenefeld serves the Federal Foreign Office and the Aircraft Readiness Department of the Federal Ministry of Defence (BMVg) as a check-in building for flights of the Federal Government and as a reception area for state visits. Photo: Bernd von Jutrczenka/dpa
RM2D8N5XN–10/31/2020, Schönefeld, Germany, Arrival of the first easyJet and the first Lufthansa flight at the new Berlin Brandenburg Willy Brandt Airport in Schönefeld.. Arrival of the first two flights from easyJet and Lufthansa to the new Berlin Brandenburg Willy Brandt Airport in Schönefeld. on October 31th.
RM2DD2MWW–05 November 2020, Brandenburg, Schönefeld: On the side facing the airfield, large glass surfaces characterize the new government terminal on the grounds of Berlin Brandenburg Airport (BER). Since the end of October 2020, the new government airport has been in operation on the military part of the new Willy Brandt Airport. The new terminal in Schoenefeld serves the Foreign Office and the Air Mission Wing of the Federal Ministry of Defence (BMVg) as a check-in building for flights of the German government, as well as a reception area for state visits. Photo: Bernd von Jutrczenka/dpa
RM2DD2MXW–05 November 2020, Brandenburg, Schönefeld: Seating is available in a small meeting room at the check-in area of the government terminal on the grounds of Berlin Brandenburg Airport (BER). Since the end of October 2020, the new government airport on the military part of the new Willy Brandt Airport is in operation. The new terminal in Schoenefeld serves the Federal Foreign Office and the Federal Ministry of Defense (BMVg) flight operations department as a check-in building for federal government flights, as well as a reception area for state visits. Photo: Bernd von Jutrczenka/dpa
RM2DD3979–05 November 2020, Brandenburg, Schönefeld: On the side facing the airfield, large glass surfaces characterize the new government terminal on the grounds of Berlin Brandenburg Airport (BER). Since the end of October 2020, the new government airport has been in operation on the military part of the new Willy Brandt Airport. The new terminal in Schoenefeld serves the Foreign Office and the Air Mission Wing of the Federal Ministry of Defence (BMVg) as a check-in building for flights of the German government, as well as a reception area for state visits. Photo: Bernd von Jutrczenka/dpa
RM2DD3977–05 November 2020, Brandenburg, Schönefeld: On the side facing the airfield, large glass surfaces characterize the new government terminal on the grounds of Berlin Brandenburg Airport (BER). Since the end of October 2020, the new government airport has been in operation on the military part of the new Willy Brandt Airport. The new terminal in Schoenefeld serves the Foreign Office and the Air Mission Wing of the Federal Ministry of Defence (BMVg) as a check-in building for flights of the German government, as well as a reception area for state visits. Photo: Bernd von Jutrczenka/dpa
RM2DD396D–05 November 2020, Brandenburg, Schönefeld: On the side facing the airfield, large glass surfaces characterize the new government terminal on the grounds of Berlin Brandenburg Airport (BER). Since the end of October 2020, the new government airport has been in operation on the military part of the new Willy Brandt Airport. The new terminal in Schoenefeld serves the Foreign Office and the Air Mission Wing of the Federal Ministry of Defence (BMVg) as a check-in building for flights of the German government, as well as a reception area for state visits. Photo: Bernd von Jutrczenka/dpa
RM2DD3978–05 November 2020, Brandenburg, Schönefeld: On the side facing the airfield, large glass surfaces characterize the new government terminal on the grounds of Berlin Brandenburg Airport (BER). Since the end of October 2020, the new government airport has been in operation on the military part of the new Willy Brandt Airport. The new terminal in Schoenefeld serves the Foreign Office and the Air Mission Wing of the Federal Ministry of Defence (BMVg) as a check-in building for flights of the German government, as well as a reception area for state visits. Photo: Bernd von Jutrczenka/dpa
RM2DD2MWB–05 November 2020, Brandenburg, Schönefeld: Large-scale art hangs in the check-in area of the government terminal on the grounds of Berlin Brandenburg Airport (BER). The new government airport on the military part of the new Willy Brandt Airport has been in operation since the end of October 2020. The new terminal in Schoenefeld serves the Federal Foreign Office and the Aircraft Readiness Department of the Federal Ministry of Defence (BMVg) as a check-in building for flights of the Federal Government and as a reception area for state visits. Photo: Bernd von Jutrczenka/dpa
RM2DD396G–05 November 2020, Brandenburg, Schönefeld: Seating is available in a meeting room in the VIP area of the government terminal on the grounds of Berlin Brandenburg Airport (BER). Since the end of October 2020, the new government airport on the military part of the new Willy Brandt Airport is in operation. The new terminal in Schoenefeld serves the Federal Foreign Office and the Federal Ministry of Defense (BMVg) flight operations department as a check-in building for federal government flights, as well as a reception area for state visits. Photo: Bernd von Jutrczenka/dpa
RM2DD2MWD–05 November 2020, Brandenburg, Schönefeld: 'Military Security Area' is written on a sign on the fence of the government terminal on the grounds of Berlin Brandenburg Airport (BER). Since the end of October 2020, the new government airport on the military part of the new Willy Brandt Airport is in operation. The new terminal in Schoenefeld serves the Federal Foreign Office and the Aircraft Readiness Department of the Federal Ministry of Defence (BMVg) as a check-in building for flights of the Federal Government and as a reception area for state visits. Photo: Bernd von Jutrczenka/dpa
RM2DD396F–05 November 2020, Brandenburg, Schönefeld: On the side facing the airfield, large glass surfaces characterize the new government terminal on the grounds of Berlin Brandenburg Airport (BER). Since the end of October 2020, the new government airport has been in operation on the military part of the new Willy Brandt Airport. The new terminal in Schoenefeld serves the Foreign Office and the Air Mission Wing of the Federal Ministry of Defence (BMVg) as a check-in building for flights of the German government, as well as a reception area for state visits. Photo: Bernd von Jutrczenka/dpa
RM2C2FKH6–17 June 2020, Brandenburg, Schönefeld: The terminal of the capital airport Berlin Brandenburg Willy Brandt (BER). According to the operator, there are no more obstacles to the planned opening of the new Capital Airport BER in October 2020. After years of delays, BER is scheduled to start operations at the end of October 2020. The operating company is owned by the states of Berlin and Brandenburg and the federal government. Photo: Patrick Pleul/dpa-Zentralbild/ZB
RM2C2FKGT–17 June 2020, Brandenburg, Schönefeld: Linden trees stand in front of the terminal of the capital airport Berlin Brandenburg Willy Brandt (BER). According to the operator, there is nothing to stop the planned opening of the new Capital Airport BER in October 2020. After years of delays, BER is scheduled to start operations at the end of October 2020. The operating company is owned by the states of Berlin and Brandenburg and the federal government. Photo: Patrick Pleul/dpa-Zentralbild/ZB
RM2C2FKGY–17 June 2020, Brandenburg, Schönefeld: Linden trees stand in front of the terminal of the capital airport Berlin Brandenburg Willy Brandt (BER). According to the operator, there is nothing to stop the planned opening of the new Capital Airport BER in October 2020. After years of delays, BER is scheduled to start operations at the end of October 2020. The operating company is owned by the states of Berlin and Brandenburg and the federal government. Photo: Patrick Pleul/dpa-Zentralbild/ZB
RM2D7W5WP–25 October 2020, Brandenburg, Schönefeld: The new lettering 'BER Terminal 5' lights up in the evening on the roof of the former Berlin Schönefeld airport. Berlin's airports are given the new abbreviation BER. A few days before the opening of the new Capital Airport, the previous codes TXL (Tegel) and SXF (Schoenefeld) will no longer be used when the winter timetable changes. The opening of the Capital Airport BER is planned for 31.10.2020. Photo: Patrick Pleul/dpa-Zentralbild/ZB
RM2CWDK84–29 September 2020, Brandenburg, Schönefeld: View of the main terminal of the airport Berlin Brandenburg 'Willy Brandt' (BER). The capital airport BER at the border to Berlin is planned to open on 31.10.2020. Photo: Patrick Pleul/dpa-Zentralbild/dpa
RM2CWDK83–29 September 2020, Brandenburg, Schönefeld: View of the main terminal of the airport Berlin Brandenburg 'Willy Brandt' (BER). The capital city airport BER at the border to Berlin is planned to be opened on 31.10.2020. Photo: Patrick Pleul/dpa-Zentralbild/dpa
RM2CWDK8B–29 September 2020, Brandenburg, Schönefeld: View of the main terminal (l) and an outbuilding of the airport Berlin Brandenburg 'Willy Brandt' (BER). The capital airport BER at the border to Berlin is planned to open on 31.10.2020. Photo: Patrick Pleul/dpa-Zentralbild/dpa
RM2CWDK87–29 September 2020, Brandenburg, Schönefeld: The main terminal of Berlin Brandenburg Airport 'Willy Brandt' (BER) is reflected in the water of a fountain. The capital city airport BER on the border to Berlin is scheduled to open on 31.10.2020. Photo: Patrick Pleul/dpa-Zentralbild/dpa
RM2CWDK8D–29 September 2020, Brandenburg, Schönefeld: A cleaning machine cleans the footpath in front of the main terminal of Berlin Brandenburg Airport 'Willy Brandt' (BER). The capital city airport BER on the border to Berlin is scheduled to open on 31.10.2020. Photo: Patrick Pleul/dpa-Zentralbild/dpa
RM2CWDK7Y–29 September 2020, Brandenburg, Schönefeld: A cleaning machine cleans the footpath in front of the main terminal of Berlin Brandenburg Airport 'Willy Brandt' (BER). The capital city airport BER on the border to Berlin is scheduled to open on 31.10.2020. Photo: Patrick Pleul/dpa-Zentralbild/dpa
RM2CWDK86–29 September 2020, Brandenburg, Schönefeld: The main terminal (l) and an outbuilding of Berlin Brandenburg Airport 'Willy Brandt' (BER) are reflected in the water of a fountain. The capital city airport BER on the border to Berlin is scheduled to open on 31.10.2020. Photo: Patrick Pleul/dpa-Zentralbild/dpa
RM2CWDK8A–29 September 2020, Brandenburg, Schönefeld: Remains of torn road surface are located in front of the main terminal of the Berlin Brandenburg Airport 'Willy Brandt' (BER). The capital city airport BER on the border to Berlin is scheduled to open on 31.10.2020. Photo: Patrick Pleul/dpa-Zentralbild/dpa
RM2DCT4PR–23 November 2020, Berlin, Schönefeld: Terminal 5 at BER Airport. The airport company plans to close the old terminal building in Schönefeld. The airport, formerly abbreviated as SXF, has been operating as Terminal 5 of BER since the opening of the new airport. Photo: Britta Pedersen/dpa-Zentralbild/dpa
RM2DCT40B–23 November 2020, Berlin, Schönefeld: Terminal 5 at BER Airport. The airport company plans to close the old terminal building in Schönefeld. The airport, formerly abbreviated as SXF, has been operating as Terminal 5 of BER since the opening of the new airport. Photo: Britta Pedersen/dpa-Zentralbild/dpa
RM2DCT4PT–23 November 2020, Berlin, Schönefeld: Terminal 5 at BER Airport. The airport company plans to close the old terminal building in Schönefeld. The airport, formerly abbreviated as SXF, has been operating as Terminal 5 of BER since the opening of the new airport. Photo: Britta Pedersen/dpa-Zentralbild/dpa
RM2DCT40H–23 November 2020, Berlin, Schönefeld: Terminal 5 at BER Airport. The airport company plans to close the old terminal building in Schönefeld. The airport, formerly abbreviated as SXF, has been operating as Terminal 5 of BER since the opening of the new airport. Photo: Britta Pedersen/dpa-Zentralbild/dpa
RM2DCT4PP–23 November 2020, Berlin, Schönefeld: Terminal 5 at BER Airport. The airport company plans to close the old terminal building in Schönefeld. The airport, formerly abbreviated as SXF, has been operating as Terminal 5 of BER since the opening of the new airport. Photo: Britta Pedersen/dpa-Zentralbild/dpa
RM2D8XJDW–31 October 2020, Berlin, Schönefeld: Willy Brandt Square in front of Terminal 1 in the evening after the opening of Berlin Brandenburg Airport Willy Brandt (BER). On the left is the Hotel Steigenberger, on the right an office building. Photo: Soeren Stache/dpa-Zentralbild/ZB
RM2D8NR0F–31 October 2020, Berlin, Schönefeld: Willy Brandt Square in front of Terminal 1 in the evening after the opening of Berlin Brandenburg Airport Willy Brandt (BER) On the left is the Hotel Steigenberger, on the right an office building. Photo: Soeren Stache/dpa-Zentralbild/dpa
RM2DCT4PK–23 November 2020, Berlin, Schönefeld: A car park in front of Terminal 5 at BER Airport. The airport company plans to close the old terminal building in Schönefeld. The airport, formerly abbreviated as SXF, has been trading as Terminal 5 of BER since the opening of the new airport. Photo: Britta Pedersen/dpa-Zentralbild/dpa
RM2DCT4PM–23 November 2020, Berlin, Schönefeld: A car park in front of Terminal 5 at BER Airport. The airport company plans to close the old terminal building in Schönefeld. The airport, formerly abbreviated as SXF, has been trading as Terminal 5 of BER since the opening of the new airport. Photo: Britta Pedersen/dpa-Zentralbild/dpa
RM2CGG29J–08 September 2020, Brandenburg, Schönefeld: A building cleaner pushes his trolley in front of the BER logo during a tour of Berlin Brandenburg Airport 'Willy Brandt' (BER) in Terminal T1. The capital city airport is scheduled to open on 31 October 2020. (motion blur due to long exposure time) Photo: Christoph Soeder/dpa
RM2EJA8YB–Berlin, Germany. 22nd Feb, 2021. Only a few cars are parked in the otherwise crowded parking lot in front of the main building of the former Schönefeld Airport on what is provisionally the last day of operation of Terminal 5 of the capital's airport BER. Following the slump in passenger numbers, the old terminal is initially to be taken offline for a year for cost reasons. Operations at BER will then run exclusively through the newly built Terminal 1. Photo: Wolfgang Kumm/dpa Credit: dpa picture alliance/Alamy Live News
RM2R8XNP3–21 June 2023, Brandenburg, Schönefeld: The former General Hotel at the former Schönefeld Airport, now Berlin Brandenburg Airport (BER). Ahead of the planned demolition of the General Hotel on the BER airport site, the Left Party and the Green Party in Brandenburg's state parliament are calling for a moratorium. The old villa on the BER site was built between 1947 and 1950 and once served as a reception building for representatives of the Soviet Union and state guests of the GDR. Demolition was originally planned because a new government terminal was to be built on the same site - but these pla
RM2R8XNP0–21 June 2023, Brandenburg, Schönefeld: The former General Hotel at the former Schönefeld Airport, now Berlin Brandenburg Airport (BER). Ahead of the planned demolition of the General Hotel on the BER airport site, the Left Party and the Green Party in Brandenburg's state parliament are calling for a moratorium. The old villa on the BER site was built between 1947 and 1950 and once served as a reception building for representatives of the Soviet Union and state guests of the GDR. Demolition was originally planned because a new government terminal was to be built on the same site - but these pla
RM2R8XNP5–21 June 2023, Brandenburg, Schönefeld: The former General Hotel at the former Schönefeld Airport, now Berlin Brandenburg Airport (BER). Ahead of the planned demolition of the General Hotel on the BER airport site, the Left Party and the Green Party in Brandenburg's state parliament are calling for a moratorium. The old villa on the BER site was built between 1947 and 1950 and once served as a reception building for representatives of the Soviet Union and state guests of the GDR. Demolition was originally planned because a new government terminal was to be built on the same site - but these pla
RM2R8XNP2–21 June 2023, Brandenburg, Schönefeld: The former General Hotel at the former Schönefeld Airport, now Berlin Brandenburg Airport (BER). Ahead of the planned demolition of the General Hotel on the BER airport site, the Left Party and the Green Party in the Brandenburg state parliament are calling for a moratorium. The old villa on the BER site was built between 1947 and 1950 and once served as a reception building for representatives of the Soviet Union and state guests of the GDR. Demolition was originally planned because a new government terminal was to be built on the same site - but these p
RM2R8XNNT–21 June 2023, Brandenburg, Schönefeld: The former General Hotel at the former Schönefeld Airport, now Berlin Brandenburg Airport (BER). Ahead of the planned demolition of the General Hotel on the BER airport site, the Left Party and the Green Party in Brandenburg's state parliament are calling for a moratorium. The old villa on the BER site was built between 1947 and 1950 and once served as a reception building for representatives of the Soviet Union and state guests of the GDR. Demolition was originally planned because a new government terminal was to be built on the same site - but these pla
RM2R8XPK1–21 June 2023, Brandenburg, Schönefeld: The former General Hotel at the former Schönefeld Airport, now Berlin Brandenburg Airport (BER). Ahead of the planned demolition of the General Hotel on the BER airport site, the Left Party and the Green Party in Brandenburg's state parliament are calling for a moratorium. The old villa on the BER site was built between 1947 and 1950 and once served as a reception building for representatives of the Soviet Union and state guests of the GDR. Demolition was originally planned because a new government terminal was to be built on the same site - but these pla
RM2R8XNP6–21 June 2023, Brandenburg, Schönefeld: The former General Hotel at the former Schönefeld Airport, now Berlin Brandenburg Airport (BER). Ahead of the planned demolition of the General Hotel on the BER airport site, the Left Party and the Green Party in Brandenburg's state parliament are calling for a moratorium. The old villa on the BER site was built between 1947 and 1950 and once served as a reception building for representatives of the Soviet Union and state guests of the GDR. Demolition was originally planned because a new government terminal was to be built on the same site - but these pla
RM2R8XNP1–21 June 2023, Brandenburg, Schönefeld: The former General Hotel at the former Schönefeld Airport, now Berlin Brandenburg Airport (BER). Ahead of the planned demolition of the General Hotel on the BER airport site, the Left Party and the Green Party in the Brandenburg state parliament are calling for a moratorium. The old villa on the BER site was built between 1947 and 1950 and once served as a reception building for representatives of the Soviet Union and state guests of the GDR. Demolition was originally planned because a new government terminal was to be built on the same site - but these p
RM2J2GFG1–28 March 2022, Brandenburg, Schönefeld: Terminal 1 of the capital city airport Berlin-Brandenburg (BER). Photo: Patrick Pleul/dpa-Zentralbild/ZB
RM2J2GFG3–28 March 2022, Brandenburg, Schönefeld: Terminal 1 of the capital city airport Berlin-Brandenburg (BER). Photo: Patrick Pleul/dpa-Zentralbild/ZB
RM2J2GFG0–28 March 2022, Brandenburg, Schönefeld: Many airplanes are parked at Terminal 1 of the capital's airport Berlin-Brandenburg (BER). Photo: Patrick Pleul/dpa-Zentralbild/ZB
RM2D8H18E–30 October 2020, Brandenburg, Schönefeld: Shops in Terminal 1 of Berlin Brandenburg Airport 'Willy Brandt' (BER). The opening of the Capital Airport BER is planned for 31.10.2020. Photo: Patrick Pleul/dpa-Zentralbild/ZB
RM2D8H19G–30 October 2020, Brandenburg, Schönefeld: People walk through Terminal 1 of the Capital Airport Berlin Brandenburg 'Willy Brandt' (BER). The opening of the Capital Airport BER is planned for 31.10.2020. Photo: Patrick Pleul/dpa-Zentralbild/ZB
RM2D8H24T–30 October 2020, Brandenburg, Schönefeld: People walk through Terminal 1 of the Capital Airport Berlin Brandenburg 'Willy Brandt' (BER). The opening of the Capital Airport BER is planned for 31.10.2020. Photo: Patrick Pleul/dpa-Zentralbild/ZB
RM2D8H24X–30 October 2020, Brandenburg, Schönefeld: Signposts are located in Terminal 1 of the Capital Airport Berlin Brandenburg 'Willy Brandt' (BER). The opening of the Capital Airport BER is planned for 31.10.2020. Photo: Patrick Pleul/dpa-Zentralbild/ZB
RM2D8H17K–30 October 2020, Brandenburg, Schönefeld: People walk through Terminal 1 of the Capital Airport Berlin Brandenburg 'Willy Brandt' (BER). The opening of the Capital Airport BER is planned for 31.10.2020. Photo: Patrick Pleul/dpa-Zentralbild/ZB
RM2D8H4AB–30 October 2020, Brandenburg, Schönefeld: People walk through Terminal 1 of the Capital Airport Berlin Brandenburg 'Willy Brandt' (BER). The opening of the Capital Airport BER is planned for 31.10.2020. Photo: Patrick Pleul/dpa-Zentralbild/ZB
RM2D8GKBC–30 October 2020, Brandenburg, Schönefeld: People walk through Terminal 1 of the Capital Airport Berlin Brandenburg 'Willy Brandt' (BER). The opening of the Capital Airport BER is planned for 31.10.2020. Photo: Patrick Pleul/dpa-Zentralbild/dpa
RM2D8GKC8–30 October 2020, Brandenburg, Schönefeld: Workers walk through Terminal 1 of the Capital Airport Berlin Brandenburg 'Willy Brandt' (BER). The opening of the Capital Airport BER is planned for 31.10.2020. Photo: Patrick Pleul/dpa-Zentralbild/dpa
RM2D8GJ97–30 October 2020, Brandenburg, Schönefeld: Police officers are walking through Terminal 1 of Berlin Brandenburg Airport 'Willy Brandt' (BER). The opening of the Capital Airport BER is planned for 31.10.2020. Photo: Patrick Pleul/dpa-Zentralbild/dpa
RM2D8GKBW–30 October 2020, Brandenburg, Schönefeld: People walk through Terminal 1 of the Capital Airport Berlin Brandenburg 'Willy Brandt' (BER). The opening of the Capital Airport BER is planned for 31.10.2020. Photo: Patrick Pleul/dpa-Zentralbild/dpa
RM2D8GKB8–30 October 2020, Brandenburg, Schönefeld: Workers walk through Terminal 1 of the Capital Airport Berlin Brandenburg 'Willy Brandt' (BER). The opening of the Capital Airport BER is planned for 31.10.2020. Photo: Patrick Pleul/dpa-Zentralbild/dpa
RM2D8GKCF–30 October 2020, Brandenburg, Schönefeld: Signposts are located in Terminal 1 of the Capital Airport Berlin Brandenburg 'Willy Brandt' (BER). The opening of the Capital Airport BER is planned for 31.10.2020. Photo: Patrick Pleul/dpa-Zentralbild/dpa
RM2D7XFR3–25 October 2020, Brandenburg, Schönefeld: The forecourt at the nocturnal Terminal 1 of the Capital Airport Berlin Brandenburg 'Willy Brandt' (BER) is deserted. The opening of the Capital Airport BER is planned for 31.10.2020. Photo: Patrick Pleul/dpa-Zentralbild/dpa
RM2D7XFR8–25 October 2020, Brandenburg, Schönefeld: The forecourt at the nocturnal Terminal 1 of the Capital Airport Berlin Brandenburg 'Willy Brandt' (BER) is deserted. The opening of the Capital Airport BER is planned for 31.10.2020. Photo: Patrick Pleul/dpa-Zentralbild/dpa
RM2D7XFR4–25 October 2020, Brandenburg, Schönefeld: The forecourt at the nocturnal Terminal 1 of the Capital Airport Berlin Brandenburg 'Willy Brandt' (BER) is deserted. The opening of the Capital Airport BER is planned for 31.10.2020. Photo: Patrick Pleul/dpa-Zentralbild/dpa
RM2D7XFPP–25 October 2020, Brandenburg, Schönefeld: The forecourt at the nocturnal Terminal 1 of the Capital Airport Berlin Brandenburg 'Willy Brandt' (BER) is deserted. The opening of the Capital Airport BER is planned for 31.10.2020. Photo: Patrick Pleul/dpa-Zentralbild/dpa
RM2D7XFR1–25 October 2020, Brandenburg, Schönefeld: The forecourt at the nocturnal Terminal 1 of the Capital Airport Berlin Brandenburg 'Willy Brandt' (BER) is deserted. The opening of the Capital Airport BER is planned for 31.10.2020. Photo: Patrick Pleul/dpa-Zentralbild/dpa
RM2D8GKB6–30 October 2020, Brandenburg, Schönefeld: Counters can be seen in Terminal 1 of the Capital Airport Berlin Brandenburg 'Willy Brandt' (BER). The opening of the Capital Airport BER is planned for 31.10.2020. Photo: Patrick Pleul/dpa-Zentralbild/dpa
RM2D7Y4PA–dpatop - 25 October 2020, Brandenburg, Schönefeld: The forecourt at the nocturnal Terminal 1 of the Capital Airport Berlin Brandenburg 'Willy Brandt' (BER) is deserted. The opening of the Capital Airport BER is planned for 31.10.2020. Photo: Patrick Pleul/dpa-Zentralbild/dpa
RM2D8GKC0–30 October 2020, Brandenburg, Schönefeld: People are standing in front of counters in Terminal 1 of the Capital Airport Berlin Brandenburg 'Willy Brandt' (BER). The opening of the Capital Airport BER is planned for 31.10.2020. Photo: Patrick Pleul/dpa-Zentralbild/dpa
RM2D8GKB2–30 October 2020, Brandenburg, Schönefeld: People are standing in front of counters in Terminal 1 of the Capital Airport Berlin Brandenburg 'Willy Brandt' (BER). The opening of the Capital Airport BER is planned for 31.10.2020. Photo: Patrick Pleul/dpa-Zentralbild/dpa
RM2D8KJC9–31 October 2020, Brandenburg, Schönefeld: Terminal 1 of the capital airport Berlin Brandenburg 'Willy Brandt' (BER) is illuminated in the early morning. The airport will open on 31.10.2020 after a long delay. Photo: Patrick Pleul/dpa-Zentralbild/dpa
RM2D8KKYY–31 October 2020, Brandenburg, Schönefeld: Terminal 1 of the capital airport Berlin Brandenburg 'Willy Brandt' (BER) is illuminated in the early morning. The airport will open on 31.10.2020 after a long delay. Photo: Patrick Pleul/dpa-Zentralbild/dpa
RM2D8KJC1–31 October 2020, Brandenburg, Schönefeld: Terminal 1 of the capital airport Berlin Brandenburg 'Willy Brandt' (BER) is illuminated in the early morning. The airport will open on 31.10.2020 after a long delay. Photo: Patrick Pleul/dpa-Zentralbild/dpa
RM2D8KJC3–31 October 2020, Brandenburg, Schönefeld: Terminal 1 of the capital airport Berlin Brandenburg 'Willy Brandt' (BER) is illuminated in the early morning. The airport will open on 31.10.2020 after a long delay. Photo: Patrick Pleul/dpa-Zentralbild/dpa
RM2D8KJC4–31 October 2020, Brandenburg, Schönefeld: Terminal 1 of the capital airport Berlin Brandenburg 'Willy Brandt' (BER) is illuminated in the early morning. The airport will open on 31.10.2020 after a long delay. Photo: Patrick Pleul/dpa-Zentralbild/dpa
RM2D8D6MC–29 October 2020, Brandenburg, Schönefeld: Passenger aircraft of the British airline Easyjet are parked on the apron at Terminal 1 of the Capital Airport Berlin Brandenburg 'Willy Brandt' (BER). The opening of BER Airport is planned for 31.10.2020. Photo: Patrick Pleul/dpa-Zentralbild/dpa
RM2D8D6M5–29 October 2020, Brandenburg, Schönefeld: Passenger aircraft of the British airline Easyjet are parked on the apron at Terminal 1 of the Capital Airport Berlin Brandenburg 'Willy Brandt' (BER). The opening of BER Airport is planned for 31.10.2020. Photo: Patrick Pleul/dpa-Zentralbild/dpa
RM2D8D6M3–29 October 2020, Brandenburg, Schönefeld: Passenger aircraft of the British airline Easyjet are parked on the apron at Terminal 1 of the Capital Airport Berlin Brandenburg 'Willy Brandt' (BER). The opening of BER Airport is planned for 31.10.2020. Photo: Patrick Pleul/dpa-Zentralbild/dpa
RM2D8D6MM–29 October 2020, Brandenburg, Schönefeld: Passenger aircraft of the British airline Easyjet are parked on the apron at Terminal 1 of the Capital Airport Berlin Brandenburg 'Willy Brandt' (BER). The opening of BER Airport is planned for 31.10.2020. Photo: Patrick Pleul/dpa-Zentralbild/dpa
RM2D8D5M1–29 October 2020, Brandenburg, Schönefeld: Passenger aircraft of the British airline Easyjet are parked on the apron at Terminal 1 of the Capital Airport Berlin Brandenburg 'Willy Brandt' (BER). The opening of BER Airport is planned for 31.10.2020. Photo: Patrick Pleul/dpa-Zentralbild/dpa
Download Confirmation
Please complete the form below. The information provided will be included in your download confirmation